Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: Lean production
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Journal of Engineering, Design and Technology (2015) 13 (3): 380–399.
Published: 06 July 2015
...., 2010) Equation 5 S. Vinodh can be contacted at: vinodh_sekar82@yahoo.com © Emerald Group Publishing Limited 2015 Lean manufacturing Value stream mapping Lean production 5S Pull production Time reduction The increasing competition has been forcing the manufacturing...
Journal Articles
Journal of Engineering, Design and Technology (2013) 11 (3): 224–250.
Published: 07 October 2013
... unless their deficient characteristics listed in Table II are overcome. Sekar Vinodh can be contacted at: vinodh_sekar82@yahoo.com © Emerald Group Publishing Limited 2013 Small and medium enterprises Lean manufacturing Lean production During the last two decades...
Journal Articles
Journal of Engineering, Design and Technology (2013) 11 (2): 129–141.
Published: 05 July 2013
... cycle time, defects, inventory; uptime has increased. This section presents the details about the case company, background details of the study and the methodology. © Emerald Group Publishing Limited 2013 Value stream mapping Lean production Waste elimination 5S and leanness...
Journal Articles
Journal of Engineering, Design and Technology (2012) 10 (2): 199–216.
Published: 06 July 2012
... the past literature, and using a rigorous, two‐stage empirical method and data from a large set of manufacturing firms, we narrow the list of items selected to represent lean production to 48 items, empirically identifying ten underlying components. Rivera and Chen (2007) have presented the expected...
