Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Public–private partnership
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Journal of Engineering, Design and Technology (2021) 19 (2): 358–372.
Published: 18 August 2020
...De-Graft Owusu-Manu; Augustine Senanu Kukah; Frank Boateng; George Asumadu; David John Edwards Purpose Conditions of inadequate and asymmetric information when an agent is hired by a principal have resulted in the problems of moral hazard and adverse selection (MHAS) in public–private partnership...
Journal Articles
De-Graft Owusu-Manu, David John Edwards, A.S. Kukah, Erika Anneli Parn, Hatem El-Gohary, M. Reza Hosseini
Journal of Engineering, Design and Technology (2018) 16 (6): 910–924.
Published: 30 October 2018
...De-Graft Owusu-Manu; David John Edwards; A.S. Kukah; Erika Anneli Parn; Hatem El-Gohary; M. Reza Hosseini Purpose Failures of public–private partnership (PPP) projects are often ascribed to the agency problem, which arise under conditions of inadequate and asymmetric information when a principal...
Journal Articles
De-Graft Owusu-Manu, David John Edwards, E.K. Kutin-Mensah, Angela Kilby, Erika Parn, Peter Edward Love
Journal of Engineering, Design and Technology (2017) 15 (2): 166–180.
Published: 03 April 2017
... represent a possible solution for both current and future infrastructure needs (Badu et al., 2012). Public–private partnership(s) [PPP(s)] represents one such approach and provide alternative sources of capital; a vehicle for improving the efficiencies in public project investment delivery...
