Skip to Main Content
Article navigation

Takes the development of a new optimization process for production scheduling and develops it into a systematic‐mathematical algorithm. Tests this algorithm against a simulated production environment and compares the generated schedules against those generated by EOQ, MRP, JIT, and OPT. The result is that bottleneck allocation methodology (BAM), with its critical resource based capacity scheduling out‐performs these other models in an intermittent demand discrete manufacturing environment.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal