Many uncertainties in Material Requirements Planning (MRP) systems are treated as “controllable” elements, with a variety of buffering, dampening and other approaches being used to cope with them. However, such approaches are often found wanting, forcing enterprises into emergency measures to ensure delivery performance. Based upon the results of a questionnaire survey, this paper analyses the uncertainties in the aggregate, intermediate and operational levels that affect customer delivery performance in MRP environments. These uncertainties have been quantified and the relative importance to performance has been investigated. The results also show the widespread use of buffering, dampening and other approaches to provide a level of delivery reliability. It is contended that by concentrating on minimising the effects of the uncertainties, the underlying causes have not been addressed, resulting in sub‐optimisation of system performance.
Article navigation
1 June 2000
This article was originally published in
Logistics Information Management
Research Article|
June 01 2000
Measuring uncertainties in MRP environments
S.C. Koh;
S.C. Koh
Researcher, Department of Manufacturing Systems Engineering, University of Hertfordshire, UK.
Search for other works by this author on:
M.H. Jones;
M.H. Jones
Principal Lecturer, Department of Manufacturing Systems Engineering, University of Hertfordshire, UK.
Search for other works by this author on:
S.M. Saad;
S.M. Saad
Senior Lecturer, Department of Manufacturing Systems Engineering, University of Hertfordshire, UK.
Search for other works by this author on:
S. Arunachalam;
S. Arunachalam
Lecturer in the Manufacturing Engineering Subject Group, Coventry University, UK.
Search for other works by this author on:
A. Gunasekaran
A. Gunasekaran
Associate Professor of Operations Management in the Department of Management, University of Massachusetts, Dartmouth, USA.
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-7948
Print ISSN: 0957-6053
© MCB UP Limited
2000
Logistics Information Management (2000) 13 (3): 177–183.
Citation
Koh S, Jones M, Saad S, Arunachalam S, Gunasekaran A (2000), "Measuring uncertainties in MRP environments". Logistics Information Management, Vol. 13 No. 3 pp. 177–183, doi: https://doi.org/10.1108/09576050010326574
Download citation file:
572
Views
New and popular articles
Suggested Reading
Managing Uncertainty in Multilevel Manufacturing Systems
Integrated Manufacturing Systems (April,1991)
Operational competitive requirements for the twenty‐first century
Industrial Management & Data Systems (March,1998)
An investigation of service‐based manufacturing performance relationships
International Journal of Operations & Production Management (August,1996)
Optimum Order Cycles in MRP Form a Geometric Progression
International Journal of Operations & Production Management (May,1991)
Finite capacity scheduling tools: observations of installations offer some lessons
Integrated Manufacturing Systems (August,1996)
Related Chapters
Network Stability, Network Externalities, and Technology Adoption
Entrepreneurship, Innovation, and Platforms
Navigating the Terrain of Medical Diagnosis and Treatment: Patient Decision Making and Uncertainty
40th Anniversary of Studies in Symbolic Interaction
Opportunity Creation, Underlying Conditions and Economic Exchange
Entrepreneurial Action
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
