Work undertaken in collaboration with BPICS, Cincom (UK) Ltd and ICI Engineering supported by funding from the EPSRC (CDP). The project reviewed planning and scheduling procedures in over 30 industrial companies over a two‐year period to establish best practice in shop‐floor scheduling and to identify the key factors for scheduling success. Outlines the research approach briefly to provide a framework for the analysis of scheduling performance by industrial sector and by scheduling tool. This includes a powerful method for the performance measurement of supply‐chain management systems which allows the comparison of effectiveness in different operating environments and when using a variety of scheduling approaches. Important elements of the project were the review and comparison of scheduling performance in conventional MRPII environments (usually a manual activity based on expediting or the use of shop floor control) with that of more recent finite capacity‐based tools and a classification of scheduling approaches. Some clear lessons have been learned. Concludes by presenting these along with an outline of the success factors which underpin effective scheduling performance in the range of best practice companies identified.
Article navigation
1 February 1995
This article was originally published in
Logistics Information Management
Research Article|
February 01 1995
Scheduling across the supply chain
David Little;
David Little
Based at the University of Liverpool, UK.
Search for other works by this author on:
John Kenworthy;
John Kenworthy
Based at the University of Liverpool, UK.
Search for other works by this author on:
Peter Jarvis;
Peter Jarvis
Based at the University of Liverpool, UK.
Search for other works by this author on:
Keith Porter
Keith Porter
Liverpool John Moores University, UK.
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-7948
Print ISSN: 0957-6053
© MCB UP Limited
1995
Logistics Information Management (1995) 8 (1): 42–48.
Citation
Little D, Kenworthy J, Jarvis P, Porter K (1995), "Scheduling across the supply chain". Logistics Information Management, Vol. 8 No. 1 pp. 42–48, doi: https://doi.org/10.1108/09576059510078765
Download citation file:
375
Views
New and popular articles
Suggested Reading
Management by objectives – a lesson in commitment and co‐operation
Managing Service Quality: An International Journal (December,1995)
Assessing Buyer/Planner Performance in the Supply Network
International Journal of Physical Distribution & Logistics Management (February,1990)
A survey on shop floor control techniques in Polish make‐to‐order companies
International Journal of Operations & Production Management (November,2001)
A review of the order release policy research
International Journal of Operations & Production Management (June,1995)
An elaborate analysis of production systems in industry: what a consultant should know
Industrial Management & Data Systems (June,2001)
Related Chapters
A multiple objective approach to assigning classes for an executive MBA program
Applications of Management Science
How are they doing? The Application of Data Envelopment Analysis to Develop a Strategic Performance Appraisal on Individual Level
A Focused Issue on Building New Competences in Dynamic Environments
Performance Management: A Marriage between Practice and Science – Just Say “I do”
Research in Personnel and Human Resources Management
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
