Discussion|
January 01 1947
DISCUSSION. TEMPORARY WORKS AND CONSTRUCTIONAL DEVICES USED IN CONNEXION WITH THE CONSTRUCTION OF THE NEW WATERLOO BRIDGE. WORKS CONSTRUCTION DIVISION.
Publisher: Emerald Publishing
Online ISSN: 2054-0507
Print ISSN: 0534-2775
© Thomas Telford and ICE
1947
The Institution of Civil Engineers Engineering Division Papers (1947) 5 (15): 40–47.
- Standard View
- Views Icon Views Open Menu
- Open the PDF for DISCUSSION. TEMPORARY WORKS AND CONSTRUCTIONAL DEVICES USED IN CONNEXION WITH THE CONSTRUCTION OF THE NEW WATERLOO BRIDGE. WORKS CONSTRUCTION DIVISION. in another window
- Share Icon Share
-
Tools Icon
Tools
Open Menu
- Cite Open Menu
- Search Site
- EPUB | PDF
Citation
FRANK P, BUCKTON EJ, HAMMOND R, WADDINGTON JC, SAURIN BF, PUCKERING EH, WILSON GA, BARNES EM, HARDING HJB, AGER JWA, HAMPSON NW (1947), "DISCUSSION. TEMPORARY WORKS AND CONSTRUCTIONAL DEVICES USED IN CONNEXION WITH THE CONSTRUCTION OF THE NEW WATERLOO BRIDGE. WORKS CONSTRUCTION DIVISION.". The Institution of Civil Engineers Engineering Division Papers, Vol. 5 No. 15 pp. 40–47, doi: https://doi.org/10.1680/idivp.1947.13068
Download citation file:
