Open figure viewer
This paper outlines the reasons for the Sheffield energy recovery facility. It provides a description of the SERF and the site, the tendering phases and the arrangements leading to the signing of the contract for detailed design and construction. It should be of interest to those who are engaged in promoting, tendering for and constructing energy recovery projects in which the principal fuel is municipal solid waste.
© 2010 Thomas Telford Ltd
2010
You do not currently have access to this content.
