The advantages of adding a pumping facility to a simple hydro power plant have been discussed in the literature. However, there has been no presentation of a general pattern on the basis of which one can decide between the installations of a simple hydro power plant and a pump-assisted one. This paper, using the dynamic programming optimisation method, presents a novel map comparing these types of hydro power plant in terms of different economic criteria including annual benefit from electricity sales, net present value, benefit–cost ratio, payback time and internal rate of return. This map can be modified for any desired set of economic parameters. Moreover, the paper includes a detailed analysis and comparison of the performance strategies of the two types of plant under different levels of ‘electricity price variability’ and ‘natural inflow rate’. The paper ends with a sensitivity analysis of the results to some major economic parameters.
Article navigation
November 2016
Research Article|
May 13 2016
A novel map for deciding on the type of a hydro power plant
Javad Mahmoudimehr, BSc, MSc, PhD;
Javad Mahmoudimehr, BSc, MSc, PhD
Assistant Professor
Department of Mechanical Engineering, Faculty of Engineering, University of Guilan, Rasht, Iran (corresponding author: mahmoudimehr@guilan.ac.ir; mahmoudimehr@alumni.iust.ac.ir)
Search for other works by this author on:
Adele Sorouri, BSc;
Adele Sorouri, BSc
Research Assistant
Department of Mechanical Engineering, Faculty of Engineering, University of Guilan, Rasht, Iran
Search for other works by this author on:
Behzad Forouzi Feshalami, BSc
Behzad Forouzi Feshalami, BSc
Research Assistant
Department of Mechanical Engineering, Faculty of Engineering, University of Guilan, Rasht, Iran
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
August 20 2015
Accepted:
April 04 2016
Online ISSN: 1751-4231
Print ISSN: 1751-4223
ICE Publishing: All rights reserved
2016
Proceedings of the Institution of Civil Engineers - Energy (2016) 169 (4): 161–178.
Article history
Received:
August 20 2015
Accepted:
April 04 2016
Citation
Mahmoudimehr J, Sorouri A, Feshalami BF (2016), "A novel map for deciding on the type of a hydro power plant". Proceedings of the Institution of Civil Engineers - Energy, Vol. 169 No. 4 pp. 161–178, doi: https://doi.org/10.1680/jener.15.00020
Download citation file: