Ground source heat pump (GSHP) systems have the potential to reduce the carbon dioxide footprint of buildings by providing them with sustainable heating and cooling energy from the ground at shallow depths. The financial viability of these systems depends on the adequate sizing of the ground heat exchangers (GHEs), which generally contribute the most to the overall capital costs of GSHP systems. Consideration of the uncertainties in the design of GHEs has the potential to improve GHE design by increasing the confidence in sizing GHEs for particular applications. This paper proposes a methodology for the estimation of the uncertainty in the design length of GHEs by considering the uncertainties involved with the selection of design parameters. By using the proposed methodology, a case study is presented where borehole GHEs are sized following a commonly applied design process recommended in the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (Ashrae) handbook. The uncertainty in the resulting length of GHEs is estimated, and the sensitivity of this uncertainty to the uncertainties in individual design parameters is discussed. In addition, measures to reduce the length uncertainty are considered.
Article navigation
1 August 2016
Research Article|
March 31 2016
Uncertainties in the design of ground heat exchangers
Olga Mikhaylova, BEng, MEng;
Department of Infrastructure Engineering, The University of Melbourne, Parkville, Australia
corresponding author: omikhaylova@unimelb.edu.au
Search for other works by this author on:
Ian W. Johnston, BSc, PhD;
Ian W. Johnston, BSc, PhD
Department of Infrastructure Engineering, The University of Melbourne, Parkville, Australia
Search for other works by this author on:
Guillermo A. Narsilio, CEng, MSc, PhD
Guillermo A. Narsilio, CEng, MSc, PhD
Department of Infrastructure Engineering, The University of Melbourne, Parkville, Australia
Search for other works by this author on:
corresponding author: omikhaylova@unimelb.edu.au
Publisher: Emerald Publishing
Received:
May 24 2015
Accepted:
March 03 2016
Online ISSN: 2051-803X
ICE Publishing: All rights reserved
2016
Environmental Geotechnics (2016) 3 (4): 253–264.
Article history
Received:
May 24 2015
Accepted:
March 03 2016
Citation
Mikhaylova O, Johnston IW, Narsilio GA (2016), "Uncertainties in the design of ground heat exchangers". Environmental Geotechnics, Vol. 3 No. 4 pp. 253–264, doi: https://doi.org/10.1680/jenge.15.00033
Download citation file:
New and popular articles
Suggested Reading
Energy performance of diaphragm walls used as heat exchangers
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (December,2016)
Numerical modelling of thermo-active piles in London Clay
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (December,2016)
A framework for understanding energy pile behaviour
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (April,2013)
Understanding the behaviour of energy geo-structures
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2011)
Thermal response testing through the Chalk aquifer in London, UK
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (April,2013)
Related Chapters
Turning segmental tunnels into sources of renewable energy
ICE Themes Smart Concrete
Addressing Renewable Energy Investments With a Strategic Perspective
Renewable Energy Investments for Sustainable Business Projects
Energy Innovation and Sustainable Development: Are the Nordic Countries More Than Bumble Bee?
Renewable Energy Investments for Sustainable Business Projects
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.