In May 2008 the High Level Bridge, which spans the River Tyne between Gateshead and Newcastle-upon-Tyne, reopened following a seven-year, £42 million programme of repair and strengthening that also encompassed its conservation as an important piece of UK national heritage. The bridge has a statutory designation as a grade I listed building, the highest designation, and is a strategic part of the rail and road systems in the north east of England. A decision was taken that the bridge required more than its regular maintenance; it required ‘renewal’—a term used by English Heritage not for replacement but for a process that occurs at a longer cycle than maintenance and is more drastic in terms of interventions and the loss of heritage values. The varied nature of necessary repairs and interventions to historic buildings (bridges are buildings under the protective legislation) means that there are no easily defined rules; judgement and the application of principles of conservation are how protection and change are managed. This paper seeks to explain the methods and processes used to give this bridge a sustainable future while managing the changes to protect and respect its historic value.
Article navigation
August 2009
Research Article|
August 01 2009
High Level Bridge: engineering successful heritage solutions Available to Purchase
T Abbott, BEng, CEng, MICE, MHKIE, MWeldI;
T Abbott, BEng, CEng, MICE, MHKIE, MWeldI
1
Senior Project Manager, Mott MacDonald
Croydon, UK
Search for other works by this author on:
L Ayling, IEng, AMIStructE
L Ayling, IEng, AMIStructE
2
Conservation engineer, English Heritage
London, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
November 04 2008
Accepted:
January 13 2009
Online ISSN: 1757-9449
Print ISSN: 1757-9430
© 2009 The authors and the Institution of Civil Engineers
2009
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (2009) 162 (3): 127–136.
Article history
Received:
November 04 2008
Accepted:
January 13 2009
Citation
Abbott T, Ayling L (2009), "High Level Bridge: engineering successful heritage solutions". Proceedings of the Institution of Civil Engineers - Engineering History and Heritage, Vol. 162 No. 3 pp. 127–136, doi: https://doi.org/10.1680/ehah.2009.162.3.127
Download citation file:
248
Views
Suggested Reading
Nineteenth-century cast-iron parapet of Blackfriars Road Bridge, London, UK
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (November,2018)
Winchelsea masonry arch bridge, Australia: first major maintenance
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (August,2014)
The Ordsall Chord, UK: conservation architecture and engineering – part 1: project overview
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (May,2020)
Rehabilitation of Brougham Castle Bridge, UK
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (February,2019)
The refurbishment of Telford’s Nantwich Aqueduct, UK
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (February,2021)
Related Chapters
The Status of Conservation of Mangroves in the Krueng Reuleng River Area, Leupung, Aceh Besar Regency, Indonesia
Proceedings of MICoMS 2017
Nonprofit Social Responsibility and Sustainability: Engaging Urban Youth through Empowerment
Corporate Social Responsibility, Sustainability, and Ethical Public Relations: Strengthening Synergies with Human Resources
Heritage Tourism and Conservation: A Cultural Resilience Bridge?
Tourism Research Paradigms: Critical and Emergent Knowledges
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
