When the 3·43 km long Queensway Tunnel under the River Mersey was built, it was described as an engineering feat without parallel. The cost was £8 million and, at the time, was said to be the biggest single municipal enterprise ever undertaken in Britain. In the summer of 2009, about 15 000 people took part in an ‘Under and Over the Mersey’ walkthrough to celebrate the 75th anniversary of the opening. Among them were two members of the original 1700 strong workforce who described their working conditions underground. About 1 200 000 t of rock and gravel were excavated during the building of Queensway Tunnel, much of which was later used to build the Otterspool Promenade on the banks of the River Mersey. Rock and gravel were replaced with 82 000 t of cast iron and 270 000 t of concrete. Working from both sides of the river, and despite what today might be considered primitive methods of excavation, when the two tunnels met mid-river there was a divergence of less than 25 mm.
Article navigation
November 2010
Review Article|
November 01 2010
Briefing: Queensway and Kingsway Tunnels, UK
N. Scales, MSc, MBA, FCILT, FIME, FIEE, FSOE, FIRTE, FRA
N. Scales, MSc, MBA, FCILT, FIME, FIEE, FSOE, FIRTE, FRA
Chief Executive
Merseytravel, Liverpool
UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
July 31 2009
Accepted:
August 13 2009
Online ISSN: 1757-9449
Print ISSN: 1757-9430
© 2010 The authors and the Institution of Civil Engineers
2010
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (2010) 163 (4): 201–203.
Article history
Received:
July 31 2009
Accepted:
August 13 2009
Citation
Scales N (2010), "Briefing: Queensway and Kingsway Tunnels, UK". Proceedings of the Institution of Civil Engineers - Engineering History and Heritage, Vol. 163 No. 4 pp. 201–203, doi: https://doi.org/10.1680/ehah.2010.163.4.201
Download citation file:
New and popular articles
Suggested Reading
An unusual marine outfall off central California, USA
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (September,2001)
Reduction of pier scour using bed suction and jet injection
Proceedings of the Institution of Civil Engineers - Water Management (February,2014)
Development and application of large-scale model test system for underwater shield tunnels
Proceedings of the Institution of Civil Engineers - Structures and Buildings (December,2019)
Liquefaction flow slides in large flumes
International Journal of Physical Modelling in Geotechnics (March,2018)
11 000 t deck superlift for RBS-8M drilling semi-submersible
Proceedings of the Institution of Civil Engineers - Structures and Buildings (May,2001)
Related Chapters
Lateral cyclic pile–soil interaction studies on a rigid model
monopile
ICE Themes Wind Turbine Foundations
22 Definitions
Port designer's handbook
Channels and harbour basins
Port Designer's Handbook
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.