Menai Suspension Bridge was completed and opened in January 1826, a triumph for Thomas Telford and the longest span in the world. Despite the success of the bridge Telford was not entirely happy and was concerned by perceived problems. During construction the bridge suffered damage in strong winds and in February 1826 six hangers broke. Breakage of six hangers was repeated again in 1836 and in 1839 the deck was virtually wrecked in a hurricane. Provis was engaged to consider the matter and designed a new, articulated and heavier deck for the bridge, the construction of which was supervised by Maude. The replacement timber deck survived until 1893 when Baker designed a new steel deck. In 1908, Rivers commenced repairs and modifications to the bridge, but these were not entirely satisfactory. Tudsbery and Gibbs were engaged to examine the bridge in 1922, and it was recognised that the carriageway and weight restrictions severely limited use of the bridge. In 1938, Dorman Long began the difficult task of reconstructing the bridge to carry the full spectrum of modern road traffic. This paper recalls the first 112 years of the history of the bridge up until the time of the reconstruction.
Article navigation
February 2012
Research Article|
February 01 2012
Menai Suspension Bridge: a history of maintenance and repair Available to Purchase
William Thomas Day, BSc, CEng, FICE
William Thomas Day, BSc, CEng, FICE
Technical Director, Structural Solutions, Hyder Consulting, London, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
May 16 2011
Accepted:
September 16 2011
Online ISSN: 1757-9449
Print ISSN: 1757-9430
ICE Publishing: All rights reserved
2012
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (2012) 165 (1): 9–19.
Article history
Received:
May 16 2011
Accepted:
September 16 2011
Citation
Day WT (2012), "Menai Suspension Bridge: a history of maintenance and repair". Proceedings of the Institution of Civil Engineers - Engineering History and Heritage, Vol. 165 No. 1 pp. 9–19, doi: https://doi.org/10.1680/ehah.2012.165.1.9
Download citation file:
Suggested Reading
Book review
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2004)
Editorial
Proceedings of the Institution of Civil Engineers - Bridge Engineering (September,2014)
Erratum: Buffeting reliability of bridges with structural uncertainties
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2015)
Foreword
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2003)
Discussion: An integral composite bridge of high skew
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2004)
Related Chapters
Tension cables in suspension bridges. A case of form-finding
Tension Structures: Form and behaviour
Introduction
Bridge Construction Equipment
Lord Hill’s Bridge Mitigation Works
Crossrail Project: Infrastructure Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.