The freezing of the Danube over the winter months was a critical influence in the provision and method of construction of what is now the Széchenyi Chain Bridge in Budapest, Hungary, between 1839 and 1849. The bridge of boats connection between the former towns of Buda and Pesth could not operate in the winter months and it was imperative that a permanent structure be built. The major considerations in building the bridge related to the dangers posed by the river freezing over: in particular, choosing a chain bridge with the least number of piers and locating it to take account of the dangers of inundation from river ice. In describing the challenges faced and overcome, the paper makes use of a wealth of material from archives in both Budapest and London. These include the original contract for building the cofferdams, the drawings referred to in the contract, British engineer, William Tierney Clark's own comments and correspondence (particularly with his superintendent engineer Adam Clark) and vivid contemporary accounts of the freezing Danube. It is therefore an amalgam of contract history, civil engineering and cultural history.
Article navigation
August 2013
Research Article|
August 01 2013
The challenge of building the Buda-Pesth Chain Bridge across the icebound Danube
Sandor P. Vaci, DipArch (Hons), MA, RIBA;
Sandor P. Vaci, DipArch (Hons), MA, RIBA
1
Principal of Vaci Partnership, London, UK
Search for other works by this author on:
John Vignoles, MA, CEng, MICE
John Vignoles, MA, CEng, MICE
2
Civil Engineer, Retired, London, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
March 13 2013
Accepted:
May 09 2013
Online ISSN: 1757-9449
Print ISSN: 1757-9430
ICE Publishing: All rights reserved
2013
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (2013) 166 (3): 146–163.
Article history
Received:
March 13 2013
Accepted:
May 09 2013
Citation
Vaci SP, Vignoles J (2013), "The challenge of building the Buda-Pesth Chain Bridge across the icebound Danube". Proceedings of the Institution of Civil Engineers - Engineering History and Heritage, Vol. 166 No. 3 pp. 146–163, doi: https://doi.org/10.1680/ehah.13.00009
Download citation file:
Suggested Reading
Conway and Britannia tubular bridges: Stephenson's team
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (February,2010)
Reconstruction of Blackfriars railway bridge, London, UK
Proceedings of the Institution of Civil Engineers - Bridge Engineering (July,2015)
Romania's Danube rail bridge—a monument to Anghel Saligny
Proceedings of the Institution of Civil Engineers - Civil Engineering (February,2002)
Newport Transporter Bridge—an historical perspective
Proceedings of the Institution of Civil Engineers - Civil Engineering (February,2000)
Colonial connections and consulting engineers 1850–1914
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (November,2011)
Related Chapters
The history and aesthetic development of bridges
ICE Manual of Bridge Engineering
Definitions
Prestressed Concrete Bridges: Design and Construction
Symbols and notation used
Prestressed Concrete Bridges: Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.