The predominant part of the navigable inland waterways in Germany was developed between the end of the nineteenth and the middle of the twentieth century. The main hydraulic structures of the barrages, such as weirs and navigation locks, were also built in this period. Meanwhile, these structures are aged but are still in operation. Thus, they have to be strengthened and repaired, and some of them have to be replaced with new structures. Furthermore, the locks have to be adapted according to the demands of modern inland navigation. Using the example of the double-chamber lock in Aldingen close to Stuttgart, the planning and execution of the overhaul of a concrete lock are described in this paper. The lock was built as part of a barrage on the River Neckar. While the construction of the lock had already started in the 1930s, the structure could not be completed until the end of the 1950s due to the Second World War. The repair of the solid construction is carried out through partial demolition of the chamber walls and the construction of reinforced-concrete facings on the chamber side of the walls.
Article navigation
February 2020
Editors
Research Article|
February 01 2020
Overhaul of solid construction locks in German federal waterways Available to Purchase
Norbert Carstensen, Dipl.-Ing.;
WTM Engineers GmbH, Hamburg, Germany
(corresponding author: info@wtm-hh.de)
Search for other works by this author on:
Ulrich Jäppelt, Dr.-Ing.;
Ulrich Jäppelt, Dr.-Ing.
CEO
WTM Engineers GmbH, Hamburg, Germany
Search for other works by this author on:
Hauke Willems, MSc
Hauke Willems, MSc
Project Engineer
WTM Engineers GmbH, Hamburg, Germany
Search for other works by this author on:
(corresponding author: info@wtm-hh.de)
Publisher: Emerald Publishing
Received:
October 10 2018
Accepted:
June 14 2019
Online ISSN: 1757-9449
Print ISSN: 1757-9430
ICE Publishing: All rights reserved
2020
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (2020) 173 (1): 26–34.
Article history
Received:
October 10 2018
Accepted:
June 14 2019
Citation
Carstensen N, Jäppelt U, Willems H (2020), "Overhaul of solid construction locks in German federal waterways". Proceedings of the Institution of Civil Engineers - Engineering History and Heritage, Vol. 173 No. 1 pp. 26–34, doi: https://doi.org/10.1680/jenhh.18.00029
Download citation file:
Suggested Reading
Emirates Air Line, London, UK: south tower substructure in the River Thames
Proceedings of the Institution of Civil Engineers - Structures and Buildings (October,2014)
Hungerford Bridge millennium project—London
Proceedings of the Institution of Civil Engineers - Civil Engineering (May,2003)
Water in rivers: flooding
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (June,2001)
Estimating transverse mixing coefficients
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (December,2001)
Simulation of the great flood of December 1870 in Rome
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (December,2003)
Related Chapters
Building a resilient system of defence against flooding from the Rhône
ICE Themes Flood Resilience
Steady uniform flow in open channels
ICE Core Concepts: Hydraulics for Civil Engineers
Open-channel flow with varying conditions
ICE Core Concepts: Hydraulics for Civil Engineers
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.