Vivekananda Bridge is a major steel bridge over the River Hooghly and is one of the first rail-cum-road bridges in colonial India. It serves as an important link between Calcutta and the rest of India through Bally, impacting passenger commuting, as well as regional trade and commerce. The bridge has seven main spans of 107 m each, supported on brick masonry piers founded on caissons. These spans are made of riveted steel members weighing about 2500 t each, 70% of which was produced indigenously. The main spans are modified Petit-type steel trusses placed at 11.6 m between the centre of booms. The total width of the bridge is about 30 m with the dual-track railway line in the middle, flanked by roadways and footpaths on both sides. The cross girders are suspended below the two bottom booms, and cantilever extensions of these cross girders carry the roadways and footpaths. Although planning for the bridge was mooted in 1912, it was not until January 1927 that the work at the site was started. The bridge was finally opened to traffic in December 1931 by the then Viceroy, Earl of Willingdon and was earlier called after him as Willingdon Bridge (also later known as Bally Bridge).
Article navigation
May 2021
Editors
Research Article|
May 01 2021
Vivekananda Bridge, India: an emblem of city connectivity
Utpal K Ghosh, BE, CEng, FIE, MICE, MIStructE
Consulting Chartered Engineer, BE 409, Salt Lake City, Kolkata, India
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
June 04 2019
Accepted:
August 24 2020
Online ISSN: 1757-9449
Print ISSN: 1757-9430
ICE Publishing: All rights reserved
2021
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (2021) 174 (2): 81–87.
Article history
Received:
June 04 2019
Accepted:
August 24 2020
Citation
Ghosh UK (2021), "Vivekananda Bridge, India: an emblem of city connectivity". Proceedings of the Institution of Civil Engineers - Engineering History and Heritage, Vol. 174 No. 2 pp. 81–87, doi: https://doi.org/10.1680/jenhh.19.00022
Download citation file:
656
Views
New and popular articles
Suggested Reading
Weathering steel bridges
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2003)
Gateshead Millennium Bridge, UK: fabrication, assembly and erection
Civil Engineering Innovation (January,2008)
Gateshead Millennium Bridge, UK: fabrication, assembly and erection
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2003)
Eight footbridges in the Rembrandt Park in Amsterdam
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2006)
Footbridge over the Sant Adria Marina in Barcelona, Spain
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2005)
Related Chapters
INFLUENCE OF CORROSION OF PRESTRESSED REINFORCEMENT ON THE FLEXURE-SHEAR INTERACTION
Concrete for Transportation Infrastructure: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
The Performance of Post-Tensioned Bridges
Role of Concrete Bridges in Sustainable Development: Proceedings of the International Symposium held at the University of Dundee, Scotland, UK on 3–4 September 2003
FRP REINFORCEMENT - FROM THE LABORATORY TO THE MARKET
Extending Performance of Concrete Structures: Proceedings of the International Seminar held at the University of Dundee, Scotland, UK on 7 September 1999
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
