Despite the guidelines framed by the Indian government, there is non-compliance with site waste-management plans (SWMPs) as well as recycling at construction sites. This paper identifies the existing barriers and potential benefits and enforcement measures for implementing SWMP and recycling of construction and demolition (C&D) waste. Data gathered by means of a questionnaire survey, structured interviews and case studies are analysed using the beneficial index value (BIV) and relative mapping approach. From the results, it is concluded that factor B4 (‘no guidelines are available in the company’) has the highest BIV (6.70) and is the major barrier in implementing SWMPs. Factors BF4 (BIV: 7.42) with an efficient SWMP (‘there will be conservation of natural resources) and MI8 (BIV: 7.32) (‘legal requirements on environmental protection’) are the most significant benefit and enforcement measure for SWMP implementation, respectively. Probable behavioural, legal, technical and marketing barriers for enforcement of recycling are identified, and the suggested measures for efficient recycling are as follows: (a) behavioural – enforcement of construction in government projects using recycled materials; (b) technical – development of code provisions for acceptable quantity of recycled construction waste (CW) in various building components; (c) legal – higher landfill charge with strict penalties for illegal dumping; and (d) marketing – increasing sales outlets for recycling material. Also, successful European C&D waste-management practices are compared with Indian initiatives to improve the CW management status.
Article navigation
22 February 2022
Research Article|
July 05 2021
Implementing site waste-management plans, recycling in India: barriers, benefits, measures
Swarna Swetha Kolaventi, M-Tech
;
Division of Construction Technology and Management, Department of Civil Engineering, National Institute of Technology Warangal, Warangal, India
(corresponding author: dietswarna@gmail.com)
Search for other works by this author on:
Hikmatullah Momand, MASCE, PMI;
Hikmatullah Momand, MASCE, PMI
MTech student
Division of Construction Technology and Management, National Institute of Technology Warangal, Warangal, India
Search for other works by this author on:
Tadepalli Phanirama Tezeswi, MASME, ASCE, ASC, APS, CEHS;
Tadepalli Phanirama Tezeswi, MASME, ASCE, ASC, APS, CEHS
Assistant Professor
Faculty of Civil Engineering, National Institute of Technology Warangal, Warangal, India
Search for other works by this author on:
M V N Siva Kumar, MIndACM, ISTE, IE, ICI
M V N Siva Kumar, MIndACM, ISTE, IE, ICI
Assistant Professor
Faculty of Civil Engineering, National Institute of Technology Warangal, Warangal, India
Search for other works by this author on:
(corresponding author: dietswarna@gmail.com)
Publisher: Emerald Publishing
Received:
May 15 2021
Accepted:
June 07 2021
Online ISSN: 1751-7680
Print ISSN: 1478-4629
ICE Publishing: All rights reserved
2022
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (2022) 175 (1): 30–51.
Article history
Received:
May 15 2021
Accepted:
June 07 2021
Citation
Kolaventi SS, Momand H, Tezeswi TP, Kumar MVNS (2022), "Implementing site waste-management plans, recycling in India: barriers, benefits, measures". Proceedings of the Institution of Civil Engineers - Engineering Sustainability, Vol. 175 No. 1 pp. 30–51, doi: https://doi.org/10.1680/jensu.21.00032
Download citation file:
Suggested Reading
Demolition waste: are we doing our best?
Proceedings of the Institution of Civil Engineers - Waste and Resource Management (May,2008)
Housing and sustainability: demolition or refurbishment?
Proceedings of the Institution of Civil Engineers - Urban Design and Planning (December,2010)
Performance of construction and demolition waste as recycled aggregates in concrete – review
Proceedings of the Institution of Civil Engineers - Construction Materials (February,2025)
Transitioning to a circular economy in the construction demolition industry: a bibliometric analysis
Built Environment Project and Asset Management (December,2024)
Reusability analytics tool for end-of-life assessment of building materials in a circular economy
World Journal of Science, Technology and Sustainable Development (October,2018)
Related Chapters
A large scale demolition in a densely populated urban area – a case study
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
REMOVAL OF GYPSUM PLASTER BY THE USE OF MICROWAVES
Challenges of Concrete Construction: Volume 5, Sustainable Concrete Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
TOTAL RECYCLING OPPORTUNITIES – TASTING THE TOPICS FOR THE CONFERENCE SESSION
Challenges of Concrete Construction: Volume 5, Sustainable Concrete Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
