To achieve optimum environmental and economically feasible recycling of construction and demolition waste (C&DW) materials it is paramount to ensure ‘clean’ (i.e. detoxified) materials. Mixed C&DW requires special treatment and costly disposal of unnecessarily large quantities of materials. A precondition for ‘clean’ demolition waste is careful sorting of the waste at source as an integrated process of the demolition work. This requires that during the demolition process planned and concise sorting of the different materials be carried out, thereby preventing any mix of the waste with hazardous materials, including materials such as asbestos, lead, mercury, PVCs, solvents and adhesives containing polychlorinated biphenyls (PCBs). Therefore, an initial identification of the presence of these materials in the buildings and structures is required. In this paper examples are given of a hazardous substance, namely PCB, found in buildings.
Article navigation
March 2005
Research Article|
March 01 2005
Eliminating hazardous materials from demolition waste Available to Purchase
N. Strufe, MA
N. Strufe, MA
Project Manager
Rambøll Consulting Engineers
Virum, Denmark
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
March 11 2004
Accepted:
October 26 2004
Online ISSN: 1751-7680
Print ISSN: 1478-4629
© 2005 Thomas Telford Ltd
2005
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (2005) 158 (1): 25–30.
Article history
Received:
March 11 2004
Accepted:
October 26 2004
Citation
Strufe N (2005), "Eliminating hazardous materials from demolition waste". Proceedings of the Institution of Civil Engineers - Engineering Sustainability, Vol. 158 No. 1 pp. 25–30, doi: https://doi.org/10.1680/ensu.2005.158.1.25
Download citation file:
Suggested Reading
Reusability analytics tool for end-of-life assessment of building materials in a circular economy
World Journal of Science, Technology and Sustainable Development (October,2018)
The design and construction of the new Mizen Head Footbridge, Ireland
Proceedings of the Institution of Civil Engineers - Bridge Engineering (April,2013)
Physical properties of demolition waste material
Proceedings of the Institution of Civil Engineers - Construction Materials (August,2008)
Temporary works for demolition of Earls Court Exhibition Centre in London, UK
Proceedings of the Institution of Civil Engineers - Civil Engineering (April,2020)
Recycling of construction wastes for manufacturing sustainable bricks
Proceedings of the Institution of Civil Engineers - Construction Materials (October,2017)
Related Chapters
A large scale demolition in a densely populated urban area – a case study
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
REMOVAL OF GYPSUM PLASTER BY THE USE OF MICROWAVES
Challenges of Concrete Construction: Volume 5, Sustainable Concrete Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
TOTAL RECYCLING OPPORTUNITIES – TASTING THE TOPICS FOR THE CONFERENCE SESSION
Challenges of Concrete Construction: Volume 5, Sustainable Concrete Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
