The London 2012 Olympic and Paralympic Games are considered to have been a great success for the UK. In building the Olympic Park, another great achievement was the clean-up and reuse of a large area of contaminated land. A remediation project of this size would typically take 5 to 15 years to complete, but the project team completed the remediation work in less than 3 years. This study provides an in-depth examination of the remediation practices at the site, mainly from the perspective of sustainable construction. Data were collected from multiple sources, including project files, publications by various government agencies and non-governmental organisations, as well as qualitative interviews with project team members. The paper first presents a review of brownfield redevelopment and sustainable remediation literature. Sustainability initiatives and achievements in the Olympic Park site remediation project are summarised and discussed. These mainly included suitable remediation strategies, recycling and reuse of contaminated soil by using soil washing and innovative in situ remediation of contaminated groundwater through bioremediation. The paper identifies a number of challenges and lessons learned regarding brownfield remediation in megaprojects, which warrant further technological development and appropriate policy actions to address.
Article navigation
1 April 2015
Research Article|
January 15 2015
Sustainable site clean-up from megaprojects: lessons from London 2012 Available to Purchase
Deyi Hou, PhD, PE, LEED AP;
Deyi Hou, PhD, PE, LEED AP
1
Project Manager, Parsons Corporation, Walnut Creek, CA, USA
Search for other works by this author on:
Abir Al-Tabbaa, PhD, CEng, FICE;
Abir Al-Tabbaa, PhD, CEng, FICE
2
Professor, University of Cambridge, Cambridge, UK
Search for other works by this author on:
Jan Hellings, MSc, PhD, DIC, MBA, CEng, FICE
Jan Hellings, MSc, PhD, DIC, MBA, CEng, FICE
3
Former Project Sponsor at Olympic Delivery Authority
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
June 30 2014
Accepted:
November 03 2014
Online ISSN: 1751-7680
Print ISSN: 1478-4629
ICE Publishing: All rights reserved
2014
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (2015) 168 (2): 61–70.
Article history
Received:
June 30 2014
Accepted:
November 03 2014
Citation
Hou D, Al-Tabbaa A, Hellings J (2015), "Sustainable site clean-up from megaprojects: lessons from London 2012". Proceedings of the Institution of Civil Engineers - Engineering Sustainability, Vol. 168 No. 2 pp. 61–70, doi: https://doi.org/10.1680/ensu.14.00025
Download citation file:
Suggested Reading
Improved site characterisation of contaminated land using pump-and-treat data
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (July,2001)
Diffusion and sorption of volatile organic compounds through soil-cement materials
Environmental Geotechnics (September,2015)
Velocity and turbulence characteristics around a silt screen
Maritime Engineering (March,2013)
Carbon dioxide accounting: 2014 Commonwealth Games Athletes' Village
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (March,2013)
Sustainability of cement-stabilised clay: sulfate resistance
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (September,2016)
Related Chapters
Microbial biosensors for environmental monitoring and sustainability
Microbial Processes in Environmental Engineering: From Theory to Practice
DOES RECYCLING FIT WITH SUSTAINABLE USE?
Achieving Sustainability in Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–6 July 2005
Transition to a Circular Economy in ASEAN-5: Inferences on Sustainable Development in a Globalised World
Green Wealth: Navigating towards a Sustainable Future
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.