Preconstruction delays (in some countries referred to as planning delays) are traditionally considered less damaging than delays that occur during construction. It transpires from this analysis that, for many project stakeholders of a hydropower project, delay before construction starts is just as damaging as time lost during construction, sometimes more so. In particular, preconstruction delay could adversely affect the government, the local people affected by the project, the environment and the project beneficiaries (e.g. consumers of power or water or those benefiting from flood protection). The project developer is adversely affected by preconstruction delay, but generally not to the same extent as by construction delay, and may thus appear to be more focused on minimising construction cost and time overruns. This research is set in a developing country context, where the economic stakes are higher and the effect of delay may be more obvious than in developed economies.
Article navigation
1 December 2016
Research Article|
October 30 2015
Loss of value: effects of delay on hydropower stakeholders Available to Purchase
Judith Plummer Braeckman, MiPP, MPhil, PhD, FCA;
Judith Plummer Braeckman, MiPP, MPhil, PhD, FCA
Researcher
Department of Engineering, Centre for Sustainable Development, University of Cambridge, Cambridge, UK
Search for other works by this author on:
Peter Guthrie, OBE, FCGI, FREng, FICE
Peter Guthrie, OBE, FCGI, FREng, FICE
Professor of Engineering for Sustainable Development
Department of Engineering, Centre for Sustainable Development, University of Cambridge, Cambridge, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
April 13 2015
Accepted:
August 10 2015
Online ISSN: 1751-7680
Print ISSN: 1478-4629
ICE Publishing: All rights reserved
2016
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (2016) 169 (6): 253–264.
Article history
Received:
April 13 2015
Accepted:
August 10 2015
Citation
Plummer Braeckman J, Guthrie P (2016), "Loss of value: effects of delay on hydropower stakeholders". Proceedings of the Institution of Civil Engineers - Engineering Sustainability, Vol. 169 No. 6 pp. 253–264, doi: https://doi.org/10.1680/jensu.15.00027
Download citation file:
Suggested Reading
Anaerobic digestion of coconut copra: methane generation potential
Journal of Environmental Engineering and Science (September,2014)
Briefing: Concentrating solar power compared with flat-plate collectors, south-east Asia
Proceedings of the Institution of Civil Engineers - Energy (May,2011)
Power from wood gasifiers in Uganda: a 250 kW and 10 kW case study
Proceedings of the Institution of Civil Engineers - Energy (November,2012)
Making low-cost micro-hydro schemes a sustainable reality
Proceedings of the Institution of Civil Engineers - Civil Engineering (February,2012)
Review of the sub-Saharan African small hydropower situation
Proceedings of the Institution of Civil Engineers - Energy (July,2018)
Related Chapters
Strategies for Sustainable Energy Consumption: Toward a Greener Future
Green Technology and the Circular Economy: Towards a Sustainable Future
Accounting Practices in Tanzanian Local Government Authorities: Towards a Grounded Theory of Manipulating Legitimacy
The Public Sector Accounting, Accountability and Auditing in Emerging Economies
Public Sector External Auditing in Tanzania: A Theory of Managing Colonising Tendencies
The Public Sector Accounting, Accountability and Auditing in Emerging Economies
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.