Open figure viewer
The distributed lag relationship between completions and starts of private dwellings in the U.K. has been studied by Whitehead (1971, 1974) and Hadjimatheou (1976), the typical relationship estimated by them being of the form
This content is only available via PDF.
© MCB UP Limited
1979
You do not currently have access to this content.
