Article navigation
Purpose

The purpose of this paper is to examine and model the in-plant operational efficiency of tow trucks of an automobile manufacturing plant. Even though, tow trucks contribute toward the improvement of operational performance, little case-based evidence prevail in the literature. For this purpose, a case study has been conducted in an Indian automobile manufacturer to address the prevailing issues in material handling (MH).

Design/methodology/approach

Initially, this paper focuses on grouping of the sequence parts and finding the shortest path among the groups. To elucidate this, an analytical framework based on the distance and stuffing quantity is proposed. A fuzzy Dijkstra’s algorithm is used to solve the issues in grouping of the sequence parts and shortest path among the groups.

Findings

This study addressed the four aspects of MH: move cost, time, distance and material by integrating the function of grouping, finding the shortest path and communication with low cost devices. The result shows that logistics routes and activities should not be interrupted by any of the external factors. The availability of stock is a key performance variable to attain efficiency. In addition to this, effective communication between the truck operators and the production line managers is key performance indicator.

Originality/value

The paper helps the automobile practitioners on increasing the efficiency of tow truck by systemizing the routes. Logistics routes and activities should not be interrupted by any of the external factors. The availability of stock is a key performance variable to attain efficiency. In addition to this, effective communication between the truck operators and the line managers is key performance indicator.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$39.00
Rental

or Create an Account

Close subscription notice
Close access options