Risk identification often produces nothing more than a long list of risks, which can be hard to understand or manage. The list can be prioritised to determine which risks should be addressed first, but this does not provide any insight into the structure of risk on the project. Traditional qualitative assessment cannot indicate those areas of the project which require special attention, or expose recurring themes, concentrations of risk, or ‘hot‐spots’ of risk exposure. The best way to deal with a large amount of data is to structure the information to aid comprehension. For risk management, this can be achieved with a Risk Breakdown Structure )RBS) a hierarchical structuring of risks on the project. The RBS can assist in understanding the distribution of risk on a project or across a business, aiding effective risk management. Just as the Work Breakdown Structure (WBS) is an important tool for projects because it scopes and defines the work, so the RBS can be an invaluable aid in understanding risk. The WBS forms the basis for many aspects of the project management process; similarly, the RBS can be used to structure and guide the risk management process. This paper presents the concept of the RBS, and gives a number of examples drawn from different project types and industries. Although not necessarily based in FM, the concepts and experience can be applied to any project. The benefits of using the RBS are then outlined, including as an aid for risk identification or risk assessment, comparison of projects, providing a framework for cross‐project risk reporting, and structuring lessons to be learned for future projects. This paper shows how to use the RBS to gain these benefits.
Article navigation
1 January 2003
Conceptual Paper|
January 01 2003
Using a Risk Breakdown Structure in project management Available to Purchase
David Hillson
David Hillson
Director of Consultancy, Project Management Professional Solutions Limited, 7 Amersham Hill, High Wycombe, Bucks HP13 6NS, UK; Tel: +44 (0)1494 479650; Fax: +44 (0)1494 479651; E‐mail: dhillson@PMProfessional.com
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1741-0983
Print ISSN: 1472-5967
© MCB UP Limited
2003
Journal of Facilities Management (2003) 2 (1): 85–97.
Citation
Hillson D (2003), "Using a Risk Breakdown Structure in project management". Journal of Facilities Management, Vol. 2 No. 1 pp. 85–97, doi: https://doi.org/10.1108/14725960410808131
Download citation file:
Suggested Reading
Risk management practices in construction projects: a qualitative exploration of MSMEs in India
Journal of Advances in Management Research (February,2025)
Identification and classification of risks in construction projects: clusters, trend studies and risk breakdown structure
Engineering, Construction and Architectural Management (June,2025)
Risk analysis of mechanical cross-passage construction using work breakdown and fault tree
Proceedings of the Institution of Civil Engineers - Forensic Engineering (February,2025)
Decentralised automated BIM collaboration: a blockchain and WBS integrated platform
Smart and Sustainable Built Environment (June,2024)
A framework to dynamic identification of project risks
Smart and Sustainable Built Environment (March,2020)
Related Chapters
Surviving Senior Seminar Research: Helpful Strategies for Improving Overall Project Performance
Infusing Undergraduate Research into Historically Black Colleges and Universities Curricula
Environmental Movement and Its Affect on a Child's Health
Being a Child in a Global World: Childhood in an Environment of Violence, Terror, Migration and Rapid Change
Project Management: Practice-Based Learning in a UK University
Integrating Curricular and Co-Curricular Endeavors to Enhance Student Outcomes
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.