Traditional cost management systems adopted by construction firms have many problems, which are widely discussed in the literature: the information provided by them is usually too late, and tends to be too aggregated and too distorted to be relevant for production management. The main objective of this research work is to propose a project cost planning and control model for construction firms. This model aims to support the development of production management systems, in which cost management and production planning and control can be gradually integrated, in order to overcome the existing limitations of cost accounting systems. The scope of the model was limited to building projects carried out by small and medium sized companies, involved in both product development and production. The development of the model was based on the literature review and also on the results of nine empirical studies conducted in four different Brazilian construction firms. The model suggests the integrated application of three fairly well known cost management techniques: operational cost estimating, S‐curves and target costing. By using this set of tools, it is expected that cost management will become more proactive, and able to deal with the dynamic, uncertain and complex construction environment that exists in most projects. The model was partially tested in two case studies, in which it provided key information for supporting decision making related to design, production planning and contracts with suppliers.
Article navigation
1 August 2006
Research Article|
August 01 2006
A model for integrating cost management and production planning and control in construction Available to Purchase
Andrea P. Kern;
Andrea P. Kern
Universidade do Vale do Rio des Sinos (UNISINOS) Av. Unisinos, 950 ‐ Bairro Cristo Rei, CEP 93.022‐000, Sao Leopoldo‐RS, Brazil
Search for other works by this author on:
Carlos T. Formoso
Carlos T. Formoso
Federal University of Rio Grande do Sul, Building Innovation Research Unit (MORIE), Av. Osvaldo Aranha 99, 3o andar, CEP 90035‐190. Porto Alegre‐RS, Brazil
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1759-8443
Print ISSN: 1366-4387
© Emerald Group Publishing Limited
2006
Journal of Financial Management of Property and Construction (2006) 11 (2): 75–90.
Citation
Kern AP, Formoso CT (2006), "A model for integrating cost management and production planning and control in construction". Journal of Financial Management of Property and Construction, Vol. 11 No. 2 pp. 75–90, doi: https://doi.org/10.1108/13664380680001081
Download citation file:
Suggested Reading
Effect of different procurement routes on contractors' cash flows
Engineering, Construction and Architectural Management (January,1996)
Three routes for target costing
Managerial Finance (January,1998)
Contemporary management accounting for the sustainable competitiveness of the South African motor manufacturing industry
Meditari Accountancy Research (April,2003)
University of Liverpool, Department of Architecture & Building Engineering
Property Management (December,2001)
Cost reallocation in social housing projects considering the desired values of end-users
Built Environment Project and Asset Management (September,2014)
Related Chapters
The Contemporary Art of Cost Management Methods during Product Development
Advances in Management Accounting
Target Costing in the Presence of Product and Production Interdependencies
Advances in Management Accounting
Methods for Cost Management during Product Development: A Review and Comparison of Different Literatures
Advances in Management Accounting
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.