Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-5 of 5
Keywords: Cost overrun
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Dickson Osei-Asibey, Joshua Ayarkwa, Benjamin Baah, Aba Essanowa Afful, Gloria Anokye, Prince Asher Nkrumah
Journal of Financial Management of Property and Construction (2025) 30 (1): 88–110.
Published: 16 August 2024
... overrun”, “idling of project resources”, “project cost overrun”, “poor quality of completed works”, “delayed realization of project benefits”, “frequent arbitration/litigation in PPP projects” and “total abandonment of PPP projects”. The study further identified the top five significant impacts of time...
Journal Articles
Stephanie Sheamar, Gayan Wedawatta, Maheshi Tennakoon, Roshani Palliyaguru, Maxwell Fordjour Antwi-Afari
Journal of Financial Management of Property and Construction (2024) 29 (2): 211–228.
Published: 18 September 2023
...Stephanie Sheamar; Gayan Wedawatta; Maheshi Tennakoon; Roshani Palliyaguru; Maxwell Fordjour Antwi-Afari Purpose Cost overrun is a significant issue in construction, an undesirable feature the industry has long been associated with. Poor procurement practices are often blamed for subsequent cost...
Journal Articles
Journal of Financial Management of Property and Construction (2018) 23 (2): 185–201.
Published: 27 July 2018
... analysis. Findings The most significant effects of project abandonment were found to be disappointment of populace and over-stretching of existing facilities. The study showed a directly proportional and an exponential effect of period of abandonment on percentage cost overrun of resuscitated projects...
Journal Articles
Journal of Financial Management of Property and Construction (2017) 22 (3): 269–285.
Published: 06 November 2017
...Alolote Ibim Amadi; Anthony Higham Purpose This paper aims to investigate the statistical validity of geotechnical risk factors in accounting for cost overruns in highway projects. The study hypothesises that “latent pathogens” because of mismanaged geotechnical risk, which lay dormant...
Journal Articles
Journal of Financial Management of Property and Construction (2014) 19 (1): 55–75.
Published: 07 April 2014
.... As a result of this situation, the construction industry, its clients and stakeholders, are continuously experiencing financial waste, losses in quality and other inconveniences associated with delays (Ramanathan et al., 2012). In addition, the effects of time overrun include cost overrun (Endut...
