Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: Time overrun
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective
Available to PurchaseDickson Osei-Asibey, Joshua Ayarkwa, Benjamin Baah, Aba Essanowa Afful, Gloria Anokye, Prince Asher Nkrumah
Journal of Financial Management of Property and Construction (2025) 30 (1): 88–110.
Published: 16 August 2024
... Stakeholders Time overrun Cost overrun Infrastructure development plays a significant role in a country’s economic growth. However, many countries are facing backlogs in the delivery of infrastructure services, with a detrimental effect on the economy and society (Mashwama et al., 2017...
Journal Articles
Cost and time implications of abandoned project resuscitation: A case study of educational institutional buildings in Nigeria
Available to Purchase
Journal of Financial Management of Property and Construction (2018) 23 (2): 185–201.
Published: 27 July 2018
..., which were represented by yc = −329.755 + 19.545x and yc = 6.1662e0.0506x, respectively. A linear relationship between period of abandonment and percentage time overrun was represented by yt = 0.467...
Journal Articles
Analysis of schedule deviations in road construction projects and the effects of project physical characteristics
Available to Purchase
Journal of Financial Management of Property and Construction (2017) 22 (2): 192–210.
Published: 07 August 2017
... for minimizing delays and cost overruns. Cost and time overruns are common in infrastructure and building construction projects. The history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns (Amehl et al., 2010). Studies...
Journal Articles
Factors contributing to project time and hence cost overrun in the Malaysian construction industry
Available to Purchase
Journal of Financial Management of Property and Construction (2014) 19 (1): 55–75.
Published: 07 April 2014
...Zayyana Shehu; Intan R. Endut; Akintola Akintoye Purpose – The delivery of construction projects in Malaysia is plagued by time overruns, which turns what should have been successful projects into those incurring additional costs, or money-losing ventures; as well as leading to various other...
