The 2ṡ65 km Gwithian outfall tunnel formed part of the tunnelling operations under the ‘Clean Sweep’ sewage/sewerage distribution system upgrade within the south-west region of the UK during the 1990s. The 3ṡ0 m high by 2ṡ8 m wide, rectangular, tracked tunnel was constructed by Trafalgar House Construction using drill and blast techniques to intercept a series of pre-drilled diffuser units 25 m below the seabed in St Ives Bay. In view of the close proximity to the seabed, and the risk of water ingress, systematic probe drilling was performed at regular intervals during construction. Where necessary, in order to reduce the water-make to within pre-defined limits, cementitious grouting of the ground ahead of the advancing face was undertaken. One major fault zone required extensive grouting, as initial probe holes were making in the order of 200 gallons per minute (909 l/min). Tunnel advance through ‘exceptionally poor’ ground required modification to the excavation methodology and implementation of additional support measures. Evaluation of geotechnical data from the undersea tunnel suggests that the Q-system provided a sound basis for assessment of rock quality and for guidance on associated support requirements. Good correlation was obtained between mapped Q-values and tunnel advance rates. Importantly, engineering judgement informed final support recommendations.
Article navigation
August 2014
Research Article|
February 04 2014
Negotiation of poor ground in an undersea tunnel Available to Purchase
John Coggan, MSc, PhD, CEng, FIMMM;
John Coggan, MSc, PhD, CEng, FIMMM
Associate Professor of Geotechnical Engineering, University of Exeter, UK
Search for other works by this author on:
Scott Yelland, MSc, CEng, MSCM, FIMMM
Scott Yelland, MSc, CEng, MSCM, FIMMM
Chief Operating Officer, Forte Energy, London, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
October 31 2013
Accepted:
December 06 2013
Online ISSN: 2043-9911
Print ISSN: 2043-9903
ICE Publishing: All rights reserved
2014
Proceedings of the Institution of Civil Engineers - Forensic Engineering (2014) 167 (3): 143–150.
Article history
Received:
October 31 2013
Accepted:
December 06 2013
Citation
Coggan J, Yelland S (2014), "Negotiation of poor ground in an undersea tunnel". Proceedings of the Institution of Civil Engineers - Forensic Engineering, Vol. 167 No. 3 pp. 143–150, doi: https://doi.org/10.1680/feng.13.00027
Download citation file:
Suggested Reading
Mobilised strength components in brittle failure of rock
Geotechnique (April,2003)
Effect of axial stiffness on soil nail forces
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (February,2015)
Construction of a deep shaft for Crossrail
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (December,2008)
Using buttress walls to reduce excavation-induced movements
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (August,2008)
Gotthard base tunnel, Switzerland – the world's longest railway tunnel
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2014)
Related Chapters
Ground and rock fragmentation – drilling and blasting
Civil Excavations and Tunnelling: A practical guide
Earth movers, excavators and open-cut excavations
Civil Excavations and Tunnelling: A practical guide
Raising, sinking and large subsurface excavations
Civil Excavations and Tunnelling: A practical guide
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.