The December 2015 floods in Cumbria, north-west England, UK, were preceded by 3 weeks of extremely wet weather, which prompted the highway bridge management team of Cumbria County Council to review their response procedures. The events of 4–6 December proved that the council’s procedures were up to the task of protecting the public from the risks of road flooding and bridge collapse, but that their resources were overstretched by the scale of the damage and the need to assess accurately the condition of closed bridges before they could be returned to service. After a year of inspections and damage reviews, measures have been identified to improve the resilience of the bridge stock, but potential areas for improvement exist in the methodology currently mandated for the assessment of risk to highway structures. It is hoped that this paper will act as a prompt to review these methods and give the guidance needed to identify the more significant factors that contribute to the overall safety of bridge structures, so that maintaining authorities can focus their efforts, and limited resources, more effectively.
Article navigation
7 December 2017
Research Article|
October 23 2017
Lessons learnt from the December 2015 flood event in Cumbria, UK
Richard Mathews, MA, CEng, FICE;
Mott MacDonald, Altrincham, UK
corresponding author: richard.mathews@mottmac.com
Search for other works by this author on:
Martin Hardman, BEng, CEng, MICE, MIStructE
Martin Hardman, BEng, CEng, MICE, MIStructE
Bridges and Contracts Delivery Manager, Cumbria County Council, Carlisle, UK
Search for other works by this author on:
corresponding author: richard.mathews@mottmac.com
Publisher: Emerald Publishing
Received:
March 20 2017
Accepted:
September 06 2017
Online ISSN: 2043-9911
Print ISSN: 2043-9903
ICE Publishing: All rights reserved
2017
Proceedings of the Institution of Civil Engineers - Forensic Engineering (2017) 170 (4): 165–178.
Article history
Received:
March 20 2017
Accepted:
September 06 2017
Citation
Mathews R, Hardman M (2017), "Lessons learnt from the December 2015 flood event in Cumbria, UK". Proceedings of the Institution of Civil Engineers - Forensic Engineering, Vol. 170 No. 4 pp. 165–178, doi: https://doi.org/10.1680/jfoen.17.00009
Download citation file:
New and popular articles
Suggested Reading
Editorial
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2004)
Erratum: Buffeting reliability of bridges with structural uncertainties
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2015)
Editorial
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2011)
Editorial – Bridge Engineering June 2009
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2009)
Editorial
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2012)
Related Chapters
UK Implementation of Eurocodes for Bridge Design – An Overview
Bridge Design to Eurocodes: UK Implementation
Eurocode Implementation – The European Context
Bridge Design to Eurocodes: UK Implementation
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
