The concept of replacement of the closure segment (RCS) emerged originally in a strengthening project for a concrete cable-stayed bridge and was intended to deal with a failure in the closure segment of the main girder. The construction procedure of RCS includes removing the failed closure segment, reconstructing the closure segment and finally improving the connection between the new closure segment and the original residual part of the main girder. Thus, a relatively complex conversion in structural state is involved. To assess the completed bridge after RCS, a finite-element model of a typical bridge is developed by using the software Dr. Bridge, and then a construction stage analysis is performed in the present study. Numerical results show that RCS eradicated the hidden structural safety danger while the structural integrity was improved to a certain extent. However, RCS had no significant influence on the geometric profile of the bridge deck, on the horizontal displacement at the top of each pylon and on tensions in the cable stays. As the stress condition in the new closure segment and associated joints between segments could not be improved by mere RCS, other strengthening measures should be taken to achieve a further structural state adjustment for the completed bridge. As a novel strengthening idea, RCS has a comparable advantage and remarkable economic benefit in dealing with local failure in the structure. Inevitably, it has some limitations in practical use.
Article navigation
26 June 2020
Research Article|
June 26 2020
Assessment of a concrete cable-stayed bridge after replacement of the closure segment Available to Purchase
Hongjiang Li, PhD
Research Institute of Highway, Ministry of Transport, China, Beijing, People’s Republic of China
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
November 25 2019
Accepted:
May 13 2020
Online ISSN: 2043-9911
Print ISSN: 2043-9903
ICE Publishing: All rights reserved
2019
Proceedings of the Institution of Civil Engineers - Forensic Engineering (2020) 172 (3): 107–117.
Article history
Received:
November 25 2019
Accepted:
May 13 2020
Citation
Li H (2020), "Assessment of a concrete cable-stayed bridge after replacement of the closure segment". Proceedings of the Institution of Civil Engineers - Forensic Engineering, Vol. 172 No. 3 pp. 107–117, doi: https://doi.org/10.1680/jfoen.19.00024
Download citation file:
Suggested Reading
Fatalities due to bridge collapses
Proceedings of the Institution of Civil Engineers - Bridge Engineering (July,2020)
Disproportionate collapse of a cable-stayed bridge
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2018)
Failure analysis of high-strength bolts in steel truss bridges
Proceedings of the Institution of Civil Engineers - Civil Engineering (March,2017)
Crowd-related failure of bridges
Proceedings of the Institution of Civil Engineers - Civil Engineering (August,2003)
A method for evaluating local scour depth at bridge piers due to debris accumulation
Proceedings of the Institution of Civil Engineers - Bridge Engineering (January,2020)
Related Chapters
STRESS-STRAIN RESPONSE AND FAILURE SURFACE OF HIGH STRENGTH CONCRETE UNDER GENERALIZED STATE OF STRESS
Innovations and Developments In Concrete Materials And Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
R&D Success in Pharmaceutical Markets: A Duration Model Approach
Health Econometrics
Failure Mode and Effect Analysis (FMEA)
Quality Management: Tools, Methods, and Standards
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.