Multiple phases of redevelopment of the London Docklands, UK, have resulted in the need to replace existing structures with new, often larger, structures. This paper presents the case history of a 1980s low-rise office building (three to four storeys) being replaced by a medium-rise (five storeys + roof terrace) recreational building structure. The 1980s building was founded on driven closed-ended steel tube piles located within one of London’s historic docks. Subsequent to the 1980s building construction, London Underground (LU) tunnels were constructed below the dock in the late 1990s in close proximity to the structure. Piling in the dock adjacent to the LU tunnels resulted in restrictions to pile construction methodology. The new structure reused the driven piles in the dock and added new onshore bored piles to accommodate a larger building footprint landwards. The pile reuse justification used the original preliminary pile load test and driving records along with current design codes. The 1980s allowable working loads stated on the design drawing were lower than that required to support the new building, thereby requiring reinterpretation of preliminary pile load test results. The pile reuse assessment justified an increase in pile working load from 1050 to 1760 kN.
Article navigation
July 2024
Research Article|
February 07 2024
Driven pile foundation reuse in East London, UK
Paul Morrison, PhD, CEng, MIEI;
Arup, London, UK
(corresponding author: paul.morrison@arup.com)
Search for other works by this author on:
Lohini Ganesharatnam, BSc
Lohini Ganesharatnam, BSc
Arup, London, UK
Search for other works by this author on:
(corresponding author: paul.morrison@arup.com)
Publisher: Emerald Publishing
Received:
November 28 2022
Accepted:
August 15 2023
Online ISSN: 2043-9911
Print ISSN: 2043-9903
Emerald Publishing Limited: All rights reserved
2024
Proceedings of the Institution of Civil Engineers - Forensic Engineering (2024) 177 (3): 87–94.
Article history
Received:
November 28 2022
Accepted:
August 15 2023
Citation
Morrison P, Ganesharatnam L (2024), "Driven pile foundation reuse in East London, UK". Proceedings of the Institution of Civil Engineers - Forensic Engineering, Vol. 177 No. 3 pp. 87–94, doi: https://doi.org/10.1680/jfoen.22.00033
Download citation file:
653
Views
New and popular articles
Suggested Reading
Embedding reuse into infrastructure projects by carrying out ‘pre-redevelopment audits’
Proceedings of the Institution of Civil Engineers - Civil Engineering (July,2023)
Sustainable cementitious materials: exploring alkali-activated binders
Proceedings of the Institution of Civil Engineers - Construction Materials (July,2023)
Review of guidelines for sustainable municipal waste management: best practices in Brazil
Proceedings of the Institution of Civil Engineers - Waste and Resource Management (January,2022)
Implementing responsible sourcing in the architecture, engineering and construction sector
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (October,2024)
Briefing: Advancing sustainability practice in geotechnical design and construction
Proceedings of the Institution of Civil Engineers - Civil Engineering (October,2025)
Related Chapters
Sustainability
Structural Design of Buildings: Fundamentals in Design, Management and Sustainability
Green Building Certification and Its Impact on Project Management Practices
Advancing Project Management: Frameworks, Digital Transformation, Sustainability and Governance
Water Demand: Estimation, Forecasting and Management
Water Supply and Distribution Systems
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.