Keywords: temporary works
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Forensic Engineering (2020) 172 (3): 97–106.
Published: 26 June 2020
... BSI   2011a   BS 6187:2011: Code of practice for full and partial demolition   BSI   London, UK BSI   2011b   BS 5975:2008+A1:2011: Code of practice for temporary works procedures and the permissible stress design of falsework   BSI   London, UK Bussell   M...
Journal Articles
Proceedings of the Institution of Civil Engineers - Forensic Engineering (2020) 172 (2): 57–60.
Published: 23 March 2020
...Bill Hewlett, MA, CEng, FICE, FIET The Temporary Works Forum was founded to give a place for professionals to come together and share their experience and learning about temporary works. 2019 marked its 10th anniversary. In this article, the founding chair reflects on why he, and the founding...
Journal Articles
Proceedings of the Institution of Civil Engineers - Forensic Engineering (2018) 171 (1): 36–44.
Published: 19 January 2018
... a higher proportion of the load. The interaction between floor and prop stiffness and load distribution is not well understood and is currently being reviewed by a working group from the Temporary Works Forum (see Pallet (2017) and Filip (2017)). Material can accumulate around drop zones and can be used...
Journal Articles
Proceedings of the Institution of Civil Engineers - Forensic Engineering (2014) 167 (2): 58–68.
Published: 01 May 2014
...Bill Hewlett, EurIng, MA, CEng, FICE; Andrew Jones, BEng, CEng, MICE; Stuart Marchand, EurIng, BA, CEng, FICE, MIStructE; Brian Bell, MA, MSc, DIC, CEng, FICE, FIStructE Major failures of UK temporary works have almost disappeared since BS 5975 was published in 1982, following the Bragg report...
Journal Articles
Proceedings of the Institution of Civil Engineers - Forensic Engineering (2013) 166 (4): 157–162.
Published: 01 November 2013
... walls with pilasters in the longitudinal direction. The spacing of concrete columns and steel frames is about 8 m. 30 01 2013 09 08 2013 ICE Publishing: All rights reserved 2013 failures steel structures temporary works Impact by a truck caused partial failure...
Journal Articles
Proceedings of the Institution of Civil Engineers - Forensic Engineering (2012) 165 (4): 161–172.
Published: 01 November 2012
... associated with failures of bridge falsework systems. 19 04 2012 26 07 2012 ICE Publishing: All rights reserved 2012 bridges failures temporary works This paper concerns the investigation of bridge falsework failures. There are various types of structural systems available...
Journal Articles
Proceedings of the Institution of Civil Engineers - Forensic Engineering (2012) 165 (2): 95–104.
Published: 01 May 2012
... ceramic tiles. 28 06 2011 02 02 2012 ICE Publishing: All rights reserved 2012 health & safety maintenance & inspection temporary works On 11 April 2006, a 40 m high scaffold on a site in Milton Keynes collapsed. There were three workers on the scaffold...

or Create an Account

Close subscription notice
Close access options