This paper describes the design, construction and early performance of a retaining structure close to a subway tunnel in Barcelona. The excavation, about 16 m deep, was carried out in 2001 during the construction of a new hospital, and involved a rectangular area with the longer side (170 m) almost parallel to the tunnel. The design had to fulfil two requirements: first, the influence of the excavation on the existing tunnel had to be minimised; and, second, the new hospital had to be isolated from vibrations from the subway owing to the high sensitivity of the medical instruments. In order to achieve this, the retaining wall was designed to be independent of the main building, and movements during the excavation stages had to be controlled. In addition, the use of subhorizontal anchors was not allowed by the metro administration, and therefore the wall comprised a line of T-shaped panels linked to shorter intermediate panels excavated using a hydromill. The stability of the wall and bending resistance were provided by the buttressing effect of the forward-facing T and the compression in the panels and anchoring force provided by post-tensioning anchors drilled into the underlying bedrock through ducts installed in the rear section of the T panels. The wall was designed using a beam–spring model with ground parameters derived from in situ tests, and the interaction between the excavation and the tunnel was modelled using a plane-strain finite element analysis imposing the wall displacements on the section. Monitoring of the wall and the tunnel confirmed that the influence of the work on the neighbouring tunnel was negligible.
Article navigation
July 2006
Research Article|
July 01 2006
Building a deep isolating wall by an existing rail tunnel
C. Molins, PhD;
C. Molins, PhD
Associate Professor
UPC, Technical University of Catalonia
Spain
Search for other works by this author on:
A. Ledesma, PhD
A. Ledesma, PhD
Professor
UPC, Technical University of Catalonia
Spain
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
September 05 2005
Accepted:
March 20 2006
Online ISSN: 1751-8563
Print ISSN: 1353-2618
© 2006 Thomas Telford Ltd
2006
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2006) 159 (3): 219–226.
Article history
Received:
September 05 2005
Accepted:
March 20 2006
Citation
Molins C, Ledesma A (2006), "Building a deep isolating wall by an existing rail tunnel". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 159 No. 3 pp. 219–226, doi: https://doi.org/10.1680/geng.2006.159.3.219
Download citation file:
New and popular articles
Suggested Reading
Finite-element analysis of secant pile wall installation
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (August,2010)
Comparison of finite element and limiting equilibrium analyses for an embedded cantilever retaining wall
Geotechnique (June,1989)
Improved techniques for the construction of retaining walls and pilles with particular referene to top-down construction
Geotechnique (March,1992)
Installation effects and their importance in the design of earth-retaining structures
Geotechnique (March,1992)
Testing of timber–glass composite walls
Proceedings of the Institution of Civil Engineers - Structures and Buildings (July,2015)
Related Chapters
Multi-aquifer pressure relief in east London
Crossrail Project: Infrastructure design and construction
East Coast Flood Risk Review - Developing Strategic Flood Risk Forecasting for Surge Tides
From Sea to Shore – Meeting the Challenges of the Sea: (Coasts, Marine Structures and Breakwaters 2013)
Diaphragm walls
Temporary Works: Principles of design and construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.