At the London Docklands Light Railway Lewisham Extension (DLR-LWE) twin tunnelling project, compensation grouting was carried out beneath sensitive structures to prevent excessive settlement due to tunnelling. However, excessive grout injections might exert extra loads on the tunnels underneath. This issue has become a major concern for tunnelling and grouting contractors after a report by the UK's Health and Safety Executive in 2000, which listed grouting force as one of the possible factors that might have caused the collapse of the London Heathrow Express tunnels in 1994. This paper presents the extensive field monitoring data compiled by the tunnelling contractor on surface and building settlements as well as tunnel lining deformations caused by compensation grouting. It will be shown that the final corrected building settlements, incorporating compensation grouting, were about 5 mm. In the case of greenfield settlement the maximum observed settlement was less than 15 mm, a criterion specified by London Underground Ltd. The settlement trough parameters were found to deviate slightly from the proposed ones, probably because of the layered ground conditions. Field monitoring data revealed that the ground disturbance caused by the first tunnel construction had resulted in more ground settlement during the construction of the second tunnel. It was difficult to understand the observed modes of tunnel lining deformations caused by compensation grouting, owing to the monitoring techniques used and the layered ground conditions. Nevertheless, the maximum observed tunnel diameter change was only 8 mm, less than 1% of tunnel diameter change. In conclusion, the surface and building settlements as well as the tunnel lining deformations were all within the criteria specified by London Underground Ltd. This indicates that the tunnelling contractor had carried out good tunnelling work.
Article navigation
April 2002
Research Article|
April 01 2002
The use of compensation grouting in tunnelling: a case study
S.-W. Lee
S.-W. Lee
Geotechnical Consulting Group (Asia) Ltd
Wanchai, Hong Kong
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
January 23 2002
Accepted:
January 29 2002
Online ISSN: 1751-8563
Print ISSN: 1353-2618
© 2002 Thomas Telford Ltd
2002
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2002) 155 (2): 101–109.
Article history
Received:
January 23 2002
Accepted:
January 29 2002
Citation
Lee S (2002), "The use of compensation grouting in tunnelling: a case study". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 155 No. 2 pp. 101–109, doi: https://doi.org/10.1680/geng.2002.155.2.101
Download citation file:
New and popular articles
Suggested Reading
A comparison between tube-à-manchette and lance grouting to assist tunnel excavation through chalk
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (July,2002)
Tube-a-manchette grouting at Upper Rivington reservoir
Dams and Reservoirs (September,2013)
Iron- and calcium-based biogrouts for porous soils
Proceedings of the Institution of Civil Engineers - Construction Materials (November,2012)
Arresting settlement of clay using low-pressure grouting
Proceedings of the Institution of Civil Engineers - Ground Improvement (April,2015)
Analysis of single-fluid jet grouting
Geotechnique (December,2000)
Related Chapters
Field Measurement by Fully Grouted Vibrating Wire Piezometers
Crossrail Project: Infrastructure Design and Construction
Analysis of single-fluid jet grouting
Ground and Soil Improvement
Remedial Grouting at Shon Sheffrey Dam, Wales
Maintaining the Safety of our Dams and Reservoirs: Proceedings of the 18th Biennial Conference of the British Dam Society at Queen’s University, Belfast, from 3–6 September 2014
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
