An 8·2m diameter, 40m deep shaft for Crossrail is being constructed below the 10m deep basement of the Moorhouse development near Moorgate in the City of London. The depth of the shaft is such that it will penetrate through stiff London Clay and will be founded at the bottom of the Lambeth Group. The shaft is being constructed after the Moorhouse structure has been completed and the design of the Moorhouse foundations places tight constraints on acceptable ground movements due to construction of the shaft. Furthermore, the shaft needs to be designed to accommodate future ground movements associated with construction of Crossrail. The paper describes the complex relationship between the foundations of Moorhouse, the draught relief shaft and the future Crossrail assets. The optimised design includes extensive slip coating and base grouting of the Moorhouse piles, a complex temporary works dewatering system around the shaft and the option to carry out additional dewatering from within the shaft during construction. Control of ground movements through the Lambeth Group was perceived to be a particular problem in relationship to destressing the ground around the Moorhouse piles. To prevent longterm settlement of these piles, provision was made for radial grouting to “restress” the ground should the need arise.
Article navigation
October 2004
Research Article|
October 01 2004
Design and construction of a deep shaft for Crossrail
P. R. J. Morrison, MSc, DIC, PhD, CEng, MICE;
P. R. J. Morrison, MSc, DIC, PhD, CEng, MICE
Arup Geotechnics
Search for other works by this author on:
A. M. McNamara, MSc, PhD;
A. M. McNamara, MSc, PhD
Skanska UK Building/Geotechnical Engineering Research Centre, City University
London
Search for other works by this author on:
T. O. L. Roberts, BSc, PhD, CEng, FICE, CGeol, MCIWEM, FRGS
T. O. L. Roberts, BSc, PhD, CEng, FICE, CGeol, MCIWEM, FRGS
WJ Groundwater Limited
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1751-8563
Print ISSN: 1353-2618
© 2004 Thomas Telford Ltd
2004
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2004) 157 (4): 173–182.
Citation
Morrison PRJ, McNamara AM, Roberts TOL (2004), "Design and construction of a deep shaft for Crossrail". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 157 No. 4 pp. 173–182, doi: https://doi.org/10.1680/geng.2004.157.4.173
Download citation file:
New and popular articles
Suggested Reading
Settlement behaviour of a soil due to artificial tree roots
Environmental Geotechnics (February,2015)
The Stability of the Slopes of Earth Dams
Geotechnique (June,1955)
Loading Tests on Clay
Geotechnique (March,1956)
The influence of vegetation on moisture and volume changes
Geotechnique (June,1983)
Evapo-transpiration and heaving clays in South Africa
Geotechnique (June,1983)
Related Chapters
Determination of Shear Strength Parameters of Tire Chips and Grains
5th ICEG Environmental Geotechnics: Opportunities, Challenges and Responsibilities for Environmental Geotechnics: Proceedings of the ISSMGE’s fifth international congress organized by the Geoenvironmental Research Centre, Cardiff University and held at Cardiff City Hall on 26–30th June 2006
Turning segmental tunnels into sources of renewable energy
ICE Themes Smart Concrete
Overview of machine learning in civil engineering
Machine Learning in Civil Engineering and Infrastructure Development: A Practitioner's Handbook
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.