Skip to Main Content
Article navigation

A modification to the load factor approach to estimating undrained volume loss for open-face tunnelling in London Clay is proposed. The modified approach is based on the nature of ground movement observed during construction of the Jubilee Line Extension at St James's Park and Elizabeth House for different stages of open-face shield tunnel construction and tunnelling using sprayed concrete linings, described in a companion paper. The new approach is shown to provide good estimates of the volume loss observed for open-face shield tunnelling in London Clay at Green Park and Regents Park.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal