An 8·2 m diameter, 37·5 m deep shaft has been successfully constructed from within the basement of a new development, Moorhouse, near Moorgate in the City of London. Programme constraints led to the shaft being constructed after completion of the foundations, basements and most of the superstructure for the development. At its closest point the shaft is less than 2 m from the large-diameter piles that support Moorhouse, and the presence of these foundations placed tight constraints on acceptable ground movements associated with construction of the shaft. The depth of the shaft is such that it penetrates through stiff London Clay and is founded at the bottom of the Lambeth Group. The paper describes the contingency measures to deal with potentially difficult ground conditions, including the water-bearing layers of the Lambeth Group. The construction processes included a complex temporary works dewatering system around the shaft, with the option to carry out additional dewatering from within the shaft during excavation. Provision was also made for radial grouting to ‘restress’ the ground, to prevent long-term settlement of the Moorhouse piles, should the need arise. The success of the project was due, in no small part, to the detailed planning and consideration of contingency measures to deal with perceived risk.
Article navigation
December 2008
Research Article|
December 01 2008
Construction of a deep shaft for Crossrail Available to Purchase
A. M. McNamara, MSc, PhD;
A. M. McNamara, MSc, PhD
Principal Geotechnical Engineer; Senior Lecturer
Skanska UK Building
London, UK
Geotechnical Engineering Research Centre, City University
London, UK
Search for other works by this author on:
T. O. L. Roberts, PhD, CEng, FICE, CGeol, MCIWEM;
T. O. L. Roberts, PhD, CEng, FICE, CGeol, MCIWEM
Managing Director
WJ Groundwater Limited
Bushey, UK
Search for other works by this author on:
P. R. J. Morrison, BAI, PhD, CEng, MIEI;
P. R. J. Morrison, BAI, PhD, CEng, MIEI
Associate Director
Arup Geotechnics
London, UK
Search for other works by this author on:
G. Holmes, PhD
G. Holmes, PhD
Engineering Manager
WJ Groundwater Limited
Bushey, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
July 20 2007
Accepted:
July 18 2008
Online ISSN: 1751-8563
Print ISSN: 1353-2618
© 2008 Thomas Telford Ltd
2008
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2008) 161 (6): 299–309.
Article history
Received:
July 20 2007
Accepted:
July 18 2008
Citation
McNamara AM, Roberts TOL, Morrison PRJ, Holmes G (2008), "Construction of a deep shaft for Crossrail". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 161 No. 6 pp. 299–309, doi: https://doi.org/10.1680/geng.2008.161.6.299
Download citation file:
Suggested Reading
Equivalent well analysis of construction dewatering systems
Geotechnique (December,1992)
Groundwater and ground movement around deep excavation
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (July,2003)
Nearshore deep excavation and associated problems in cohesionless soil
Proceedings of the Institution of Civil Engineers - Forensic Engineering (September,2020)
Optimal dewatering of an excavation site
Proceedings of the Institution of Civil Engineers - Water Management (June,2012)
Influence of large-scale inhomogeneities on a construction dewatering system in chalk
Geotechnique (August,2010)
Related Chapters
Control of groundwater
Temporary Works: Principles of Design and Construction
Ground and rock fragmentation – drilling and blasting
Civil Excavations and Tunnelling: A practical guide
Earth movers, excavators and open-cut excavations
Civil Excavations and Tunnelling: A practical guide
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.