The Thames Water ring main extension is a 4·5 km long tunnel from Stoke Newington, in the London borough of Hackney, to New River Head in Finsbury, in the London borough of Islington. The 2·85 m i.d. tunnel was excavated by an earth pressure balance tunnel-boring machine (TBM) at depths between 40 and 60 m below the surface. Surface settlements along the route were measured by precise levelling, and were found to be small. It was therefore even more important to measure these settlements as accurately as possible, in order to provide informed estimates of subsurface movements induced in third-party underground structures much closer to the tunnel horizon. Because of the relatively large magnitude of the background movements measured, when compared with the small tunnel-induced settlements, it was necessary to adopt a rigorous statistical method to fit a Gaussian curve to the data. This exploited the analogy of the ‘error function' to define the Gaussian curve parameters i and Vl. In all, 13 tunnels were underpassed successfully by the TBM, all within the ‘conservative expected value' predictions, and without incident. The predictions and structural monitoring schemes undertaken for the High Speed 1 tunnels near Corsica Street and the Northern line tunnels near Angel station are described in the paper. It was found that the surface and subsurface trough width parameter K did not vary with depth as predicted: therefore a new relationship is proposed.
Article navigation
June 2010
Research Article|
June 01 2010
Low-volume-loss tunnelling for London ring main extension
B. D. Jones, MEng, EngD
B. D. Jones, MEng, EngD
Engineering Manager
Morgan Est, Rugby, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Revision Received:
July 16 2009
Accepted:
February 24 2010
Online ISSN: 1751-8563
Print ISSN: 1353-2618
© 2010 Thomas Telford Ltd
2010
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2010) 163 (3): 167–185.
Article history
Revision Received:
July 16 2009
Accepted:
February 24 2010
Citation
Jones BD (2010), "Low-volume-loss tunnelling for London ring main extension". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 163 No. 3 pp. 167–185, doi: https://doi.org/10.1680/geng.2010.163.3.167
Download citation file:
Suggested Reading
Remote sensing for highway management of landslides
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (June,2009)
Satellite mapping in cities: how good can it get?
Proceedings of the Institution of Civil Engineers - Civil Engineering (August,2009)
A review of satellite positioning systems for civil engineering
Proceedings of the Institution of Civil Engineers - Civil Engineering (August,2015)
The role of geomorphology in flood risk assessment
Proceedings of the Institution of Civil Engineers - Civil Engineering (May,2002)
GPS measurements on the London Millennium Bridge
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2006)
Related Chapters
Simulating Rainwater Harvesting System Performance for a Campus University in Malaysia
Water Management and Sustainability in Asia
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
