In this study, well-instrumented field tests on bored piles were conducted at two construction sites in Zhejiang, China. At the first site, three bored piles in clay deposits overlying rock were load-tested to investigate the load transfer and deformation behaviour of a single pile. The lengths of the 1·1 m diameter test piles ranged from 88 m to 120 m, allowing particular insight into the in situ performance of long piles. In addition, the load–settlement behaviour of these piles within a piled raft group was observed during and after construction of the building they supported. At the second site, four bored piles 32 m long and 0·6 m in diameter were observed during single-pile static load tests, and during and after construction of the overlying building. The pile-head settlement was observed to be due mainly to the compression of the pile shaft for the long pile at the first site. The threshold of slip displacement for fully mobilising the shaft resistance was found to be 15–20 mm and 10–15 mm in clayey and silty deposits respectively. The measured load–deformation behaviour at the pile base demonstrates that the base resistance of single piles in a piled raft system is greater than that in the single-pile condition, and the pile-group settlement ratio is related to the applied pile-head load. The bearing pressure under the perimeter of the raft was measured and found to be greater than the bearing pressure beneath the central part of the raft, although the ratio between these values was found to vary with the applied structural load. In the cases studied, approximately 80% of the applied structural load was carried by the piles; the remainder was carried by the raft in bearing against the soil.
Article navigation
December 2010
Research Article|
December 01 2010
Field performance of long bored piles within piled rafts
Q. Zhang, BEng;
Q. Zhang, BEng
MOE Key Laboratory of Soft Soils and Geoenvironmental Engineering
Institute of Geotechnical Engineering, Zhejiang University, People's Republic of China
Search for other works by this author on:
Z. Zhang, MPhil, PhD;
Z. Zhang, MPhil, PhD
MOE Key Laboratory of Soft Soils and Geoenvironmental Engineering
Institute of Geotechnical Engineering, Zhejiang University, People's Republic of China
Search for other works by this author on:
F. Yu, MPhil, PhD;
F. Yu, MPhil, PhD
Zhejiang Sci-Tech University
People's Republic of China
Search for other works by this author on:
J. Liu, MPhil
J. Liu, MPhil
MOE Key Laboratory of Soft Soils and Geoenvironmental Engineering
Institute of Geotechnical Engineering, Zhejiang University, People's Republic of China
Search for other works by this author on:
Publisher: Emerald Publishing
Revision Received:
December 22 2008
Accepted:
October 11 2009
Online ISSN: 1751-8563
Print ISSN: 1353-2618
© 2010 Thomas Telford Ltd
2010
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2010) 163 (6): 293–305.
Article history
Revision Received:
December 22 2008
Accepted:
October 11 2009
Citation
Zhang Q, Zhang Z, Yu F, Liu J (2010), "Field performance of long bored piles within piled rafts". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 163 No. 6 pp. 293–305, doi: https://doi.org/10.1680/geng.2010.163.6.293
Download citation file:
New and popular articles
Suggested Reading
INFORMAL DISCUSSION. ARE PILES NECESSARY ?
Proceedings of the Institution of Civil Engineers (April,1968)
Vibration stability of Orion laser facility
Proceedings of the Institution of Civil Engineers - Structures and Buildings (October,2015)
Field study of construction effects in jacked and driven steel H-piles
Geotechnique (February,2009)
Dynamic modeling of induction motor taking into account thermal stresses
COMPEL (January,2007)
Error bounds for the FEM numerical solution of non‐linear field problems
COMPEL (September,2004)
Related Chapters
Importance of seismic site response and soil–structure interaction in the dynamic behaviour of a tall building founded on piles
Geotechnical Earthquake Engineering: Géotechnique Symposium in Print 2015
Tower crane bases
Temporary Works: Principles of Design and Construction
Foundation types and conceptual design principles
ICE Manual of Geotechnical Engineering, Volume II: Geotechnical design, construction and verification
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.