This paper presents the assessment of short- and long-term settlements and bearing capacity of a 13 m high chalk fill platform for a housing development in a former chalk quarry in Medway Gate, Kent, UK. A roped-access inspection followed by an intrusive site investigation provided evidence that the quality of in situ chalk improved with depth. It was also indicated that there was sufficient structured chalk on site for the platform construction. End-product specification with the stipulation of dry density and moisture content limits was used for the required chalk compaction. Trial compactions were carried out to confirm roller suitability and the thickness of each compacted layer. Nuclear density tests supplemented by sand replacement and laboratory tests provided a quick means of monitoring dry density and moisture content during construction. In situ plate bearing tests confirmed that compacted chalk with a dry density above 1·55 Mg/m3 could generally provide a bearing capacity greater than 150 kN/m2 as required in the contract. Post-construction settlement monitoring results indicated both immediate and creep settlements in the compacted chalk, and confirmed the time required for creep settlement to complete: hence the suitable timing for house construction.
Article navigation
December 2011
Research Article|
December 01 2011
Chalk fill platform for house construction: a case study
Kwok Cheung Law, MEng, DIC, MSc, CEng, MICE
Kwok Cheung Law, MEng, DIC, MSc, CEng, MICE
previously Technical Director
WSP Environmental, Basingstoke, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Revision Received:
April 27 2009
Accepted:
August 16 2010
Online ISSN: 1751-8563
Print ISSN: 1353-2618
ICE Publishing: All rights reserved
2011
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2011) 164 (6): 373–383.
Article history
Revision Received:
April 27 2009
Accepted:
August 16 2010
Citation
Law KC (2011), "Chalk fill platform for house construction: a case study". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 164 No. 6 pp. 373–383, doi: https://doi.org/10.1680/geng.9.00038
Download citation file:
Suggested Reading
Editorial
Geotechnical Research (September,2014)
Editorial
Geotechnical Research (March,2015)
Editorial
Geotechnical Research (March,2014)
Editorial
Geotechnical Research (December,2014)
Discussion: An apparatus for the plastic limit and workability of soils
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (August,2011)
Related Chapters
Determination of Shear Strength Parameters of Tire Chips and Grains
5th ICEG Environmental Geotechnics: Opportunities, Challenges and Responsibilities for Environmental Geotechnics: Proceedings of the ISSMGE’s fifth international congress organized by the Geoenvironmental Research Centre, Cardiff University and held at Cardiff City Hall on 26–30th June 2006
Turning segmental tunnels into sources of renewable energy
ICE Themes Smart Concrete
Overview of machine learning in civil engineering
Machine Learning in Civil Engineering and Infrastructure Development: A Practitioner's Handbook
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.