Penetrating limestone in Malmö, Sweden, the underground works at Citytunneln comprise two parallel 7·8 m internal diameter railway tunnels, 6 km long, excavated with tunnel-boring machines. Triangeln Station, halfway along the tunnels, is a 30 m wide cavern with 15 m soil/rock cover and a row of pillars for central support. Malmö C Station at the northern end is an open cut-and-cover structure. There are two contracts, one for the tunnels and cavern (Lot E201) and another for Malmö C Station (Lot E101). Differing risk management techniques maintained an appropriate balance in the risk distribution. Groundwater lowering close to the harbour and the stability of adjacent historic buildings were the main hazards in E101. The design was based on the client's geotechnical interpretative report (GIR), and encountered deviations were compensated within a unit rate contract (E101). By contrast, the tunnelling risks in E201 were handled in a design–build contract (Lot E201), with the contractor responsible for the GIR. The geotechnical risk management was based on contractual geotechnical reference conditions. The observational method was used successfully to mitigate geotechnical hazards as well as to exploit opportunities.
Article navigation
February 2012
Research Article|
February 01 2012
Citytunneln, Malmö: geotechnical hazards and opportunities Available to Purchase
Jan Hartlén, PhD;
Jan Hartlén, PhD
Director
JH GeoConsulting AB, Limhamn, Sweden
Search for other works by this author on:
Henrik Christensen, MSc (CE);
Henrik Christensen, MSc (CE)
Project Director
Fehmarn Bridge Project, Denmark
Search for other works by this author on:
Sven Jansson, MSC (CE)
Sven Jansson, MSC (CE)
Senior Consultant
SWECO Infrastructure, Sweden
Search for other works by this author on:
Publisher: Emerald Publishing
Revision Received:
September 22 2009
Accepted:
May 28 2010
Online ISSN: 1751-8563
Print ISSN: 1353-2618
ICE Publishing: All rights reserved
2012
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2012) 165 (1): 35–44.
Article history
Revision Received:
September 22 2009
Accepted:
May 28 2010
Citation
Hartlén J, Christensen H, Jansson S (2012), "Citytunneln, Malmö: geotechnical hazards and opportunities". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 165 No. 1 pp. 35–44, doi: https://doi.org/10.1680/geng.9.00079
Download citation file:
Related Chapters
Determination of Shear Strength Parameters of Tire Chips and Grains
5th ICEG Environmental Geotechnics: Opportunities, Challenges and Responsibilities for Environmental Geotechnics: Proceedings of the ISSMGE’s fifth international congress organized by the Geoenvironmental Research Centre, Cardiff University and held at Cardiff City Hall on 26–30th June 2006
Turning segmental tunnels into sources of renewable energy
ICE Themes Smart Concrete
Overview of machine learning in civil engineering
Machine Learning in Civil Engineering and Infrastructure Development: A Practitioner's Handbook
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
