Using embodied energy as a quantitative measure of environmental impact, this study evaluated the embodied energy of two built sections of the UK Channel Tunnel rail link, now known as High Speed 1, and an alternative design. Results show that contract 220's 7·15 m diameter twin bored tunnel section of 7·5 km has an embodied energy of 949 TJ, whereas 7·3 km of contract 310's, consisting mainly of a pile-slab structure, consumed 678 TJ. The alternative design for contract 310, based on a conventional embankment design, would have consumed 640 TJ. By examining the embodied energy content, these geotechnical structures can be categorised into the following two types: (a) structures of which the materials are totally dominant at 90% of the total energy, such as pile-slab; and (b) more direct energy-intensive constructions, where the transportation and installation can collectively account for as much as 40% of the total, such as the tunnel and the embankment. In both types materials are generally the dominating energy consumer: therefore engineers should optimise designs using fewer embodied energy-intensive materials. When compared with the annual UK household energy consumption, the embodied energy values of these structures are equivalent to over 10 000 annual households' consumption. This comparison reveals the large scale of energy involved in geotechnical infrastructure construction, compared to activities in everyday life. This calls for more attention to evaluate the embodied energy of geotechnical constructions as part of design evaluations.
Article navigation
1 April 2012
Research Article|
August 30 2011
Embodied energy evaluation for sections of the UK Channel Tunnel rail link Available to Purchase
Chris Chau;
Chris Chau
PhD student
Department of Engineering, University of Cambridge, UK
Search for other works by this author on:
Kenichi Soga;
Kenichi Soga
Professor of Civil Engineering
Department of Engineering, University of Cambridge, UK
Search for other works by this author on:
Nick O'Riordan;
Nick O'Riordan
Director
Arup Italia srl, Rome, Italy
Search for other works by this author on:
Duncan Nicholson
Duncan Nicholson
Director
Arup, London, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Revision Received:
March 08 2009
Accepted:
February 24 2010
Online ISSN: 1751-8563
Print ISSN: 1353-2618
ICE Publishing: All rights reserved
2012
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2012) 165 (2): 65–81.
Article history
Revision Received:
March 08 2009
Accepted:
February 24 2010
Citation
Chau C, Soga K, O'Riordan N, Nicholson D (2012), "Embodied energy evaluation for sections of the UK Channel Tunnel rail link". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 165 No. 2 pp. 65–81, doi: https://doi.org/10.1680/geng.9.00018
Download citation file:
Suggested Reading
Utilisation of geothermal resources
Proceedings of the Institution of Civil Engineers - Energy (February,2009)
The Shichika Canal of Japan since the twelfth century
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (August,2022)
Wanted - energy and environmental consultants
Structural Survey (March,1999)
The influence of hydropower schemes on river-related humidity
Proceedings of the Institution of Civil Engineers - Energy (May,2014)
Demonstrating environmental benefits of ground improvement
Proceedings of the Institution of Civil Engineers - Ground Improvement (February,2010)
Related Chapters
SCIENTIFIC AND SOCIETAL ISSUES INVOLVED IN DEVELOPING SUSTAINABLE CEMENTS
Role of Cement Science in Sustainable Development: Proceedings of the International Symposium held at the University of Dundee, Scotland, UK on 3–4 September 2003
Sustainability Rhetoric in Modern Times
Achieving Net Zero: Challenges and Opportunities
An Overview of Real Estate Sustainability in Romania
Sustainable Real Estate in the Developing World
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.