At over 50 m long, 17 m wide and 15 m high the Stepney Green Cavern is one of the largest caverns ever built using sprayed concrete lining techniques in central London. The east- and westbound caverns lie approximately 20 m below the existing ground level in a constrained urban site and are located within the London Clay and underlying Lambeth Group, which is a variable series of clays, silts and sands; the higher permeability sands contain high pore pressures that are hazardous to sprayed concrete lining construction without depressurisation. Successful implementation of a practical depressurisation scheme was therefore crucial to safe construction. The overall strategy adopted for investigating these water-bearing sands within the Lambeth Group is outlined and the ground investigations and pumping tests required to determine typical material permeabilities and the response of the sands to pumping are described. The paper also reviews how that information was developed into the outline depressurisation scheme and how this was subsequently developed into the final contractor-designed depressurisation scheme that was implemented. Changes to the scheme during construction owing to ground conditions are discussed, together with the response of the ground during pumping.
Article navigation
June 2015
Editors
Research Article|
June 01 2015
Depressurisation for the excavation of Stepney Green cavern Available to Purchase
Emilio Linde-Arias, BSc, MSc, DIC, EurGeol, FGS;
Emilio Linde-Arias, BSc, MSc, DIC, EurGeol, FGS
Senior Engineering Geologist
OTB Engineering Limited, London, UK
Search for other works by this author on:
David Harris, BSc, MSc, DIC, CGeol, FGS, CEng, MICE;
David Harris, BSc, MSc, DIC, CGeol, FGS, CEng, MICE
Principal Engineer
Mott MacDonald Group Limited, Croydon, UK
Search for other works by this author on:
Andrew Davis, BSc, MSc, CGeol, FGS
Andrew Davis, BSc, MSc, CGeol, FGS
Principal Engineering Geologist
Mott MacDonald Group Limited, Croydon, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Revision Received:
March 31 2014
Accepted:
January 26 2015
Online ISSN: 1751-8563
Print ISSN: 1353-2618
ICE Publishing: All rights reserved
2015
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2015) 168 (3): 215–226.
Article history
Revision Received:
March 31 2014
Accepted:
January 26 2015
Citation
Linde-Arias E, Harris D, Davis A (2015), "Depressurisation for the excavation of Stepney Green cavern". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 168 No. 3 pp. 215–226, doi: https://doi.org/10.1680/geng.14.00061
Download citation file:
Suggested Reading
Managing geotechnical risk: time for change?
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (January,2001)
Design methods for granular filters—critical review
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (July,1999)
Assessment of settlements caused by groundwater control
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (October,2000)
Environmental regulation of groundwater abstraction for dewatering works
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (April,2001)
Improving internal erosion resistance of silty sand using additives
Dams and Reservoirs (May,2020)
Related Chapters
Predict Environmental Conditions Using Groundwater Interpretation in Subdistrict Hamparan Perak, Deli Serdang, North Sumatera
Proceedings of MICoMS 2017
Groundwater control
ICE Manual of Geotechnical Engineering, Volume II: Geotechnical design, construction and verification
Groundwater
The Essence of Geotechnical Engineering: 60 years of Géotechnique
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.