Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Issue Section
Date
Availability
1-14 of 14
Keywords: temporary works
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2024) 177 (6): 733–742.
Published: 02 December 2024
... strength temporary works Granular working platforms are intended to provide a robust, stiff, permeable, weatherproof, free-draining layer to support plant and construction activities and spread loads sufficiently onto the underlying soils. Materials might be site-won or imported to site and may...
Journal Articles
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2024) 177 (2): 158–168.
Published: 12 April 2023
... at the two N values through back-analysis of the H = 0 and H = ∞ tests, the same values which were then adopted for the two-layer analyses. bearing capacity design methods & aids finite-element analysis finite-element limit analysis foundations temporary works...
Journal Articles
Andrew Smith, MA, PhD, MBA, CEng, FICE, CGeol, FGS, Ria Blackmore, MEng, CEng, MICE, Ying Tay, BEng, PhD, CEng, FICE, Pawan Sethi, BEng (Hons), MSc, CEng, MICE, CPEng, FIEAust
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2021) 174 (4): 461–472.
Published: 28 April 2021
... were assessed and how a basement construction strategy was developed to overcome them. 03 08 2020 09 03 2021 ICE Publishing: All rights reserved 2021 diaphragm & in situ walls excavation temporary works The ICD Brookfield Place development occupies a prime site next...
Journal Articles
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2020) 173 (1): 13–20.
Published: 28 May 2019
... 16 04 2019 ICE Publishing: All rights reserved 2019 design methods & aids foundations temporary works Tani and Craig (1995) characterised the increased bearing capacity of circular foundations on clay using a dimensionless ratio kB/su0 where...
Journal Articles
Martin Preene, BEng, PhD, CEng, CGeol, CSci, CEnv, FICE, FGS, C.WEM, FCIWEM, Toby O. L. Roberts, PhD, CEng, CGeol, FREng, FICE, FGS
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2017) 170 (4): 367–390.
Published: 08 February 2017
... 08 2016 16 12 2016 ICE Publishing: All rights reserved 2016 geotechnical engineering groundwater temporary works Chalk is a relatively soft fissured limestone rock of Cretaceous age present beneath many areas of the UK and north-western Europe. The potential problems...
Journal Articles
Shong-Loong Chen, BEng MEng, PhD, Cheng-Tao Ho, BEng MEng, Meen-Wah Gui, BEng, PhD CEng MICE MIStructE
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2014) 167 (3): 297–310.
Published: 01 June 2014
... clay Sand Sandstone A MC MC — MC (inclined) B MC SS MC MC (inclined) C MC SSC MC MC (inclined) D MC SSC MC MC (horizontal) excavation diaphragm walls temporary works In summary, four cases were considered for analysis (Table 3). Case A omitted the sand...
Journal Articles
Hoe-Chian Yeow, BSc, PhD, CEng, MICE, Duncan Nicholson, BSc, CEng, MICE, Chui-Loung Man, BEng, Alistair Ringer, MA, MEng, CEng, MICE, Paul Glass, BEng, CEng, FICE, FICES, Mike Black, MSc, CSci, CGeol, FGS
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2014) 167 (2): 182–193.
Published: 01 April 2014
... design to control the subsequent excavation is described: this included trigger criteria, a review process and predetermined contingency measures to ensure safe execution of the excavation works. A genuinely collaborative effort between client, permanent and temporary works designers, independent design...
Journal Articles
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2014) 167 (2): 205–216.
Published: 01 April 2014
... construction through continuous on-site observation and a comprehensive monitoring programme. Figure 2. Site layout 12 11 2013 01 4 2013 ICE Publishing: All rights reserved 2014 excavation geotechnical engineering temporary works c′ characteristic...
Journal Articles
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2012) 165 (1): 3–12.
Published: 01 February 2012
...: 20 1 2011 17 12 2009 ICE Publishing: All rights reserved 2012 codes of practice & standards excavation temporary works cu undrained cohesion cu;d design value of undrained cohesion ka active...
Journal Articles
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2008) 161 (6): 279–281.
Published: 01 December 2008
... excavations © 2008 Thomas Telford Ltd 2008 design methods & aids piles & piling temporary works NOTATION cu undrained shear strength of cohesive subgrade D depth of platform material Kp tan δ punching...
Journal Articles
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2002) 155 (4): 221–227.
Published: 01 October 2002
... histories presented. © 2002 Thomas Telford Ltd 2002 07 03 2002 22 06 2002 groundwater temporary works tunnels & tunnelling Base heave can be avoided if the pore water pressures and corresponding piezometric level are lowered in water-bearing layers beneath the excavation...
Journal Articles
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2002) 155 (4): 229–242.
Published: 01 October 2002
... was subjected to angular distortions of up to 1 in 125—values that are close to the tolerable limit. These movements ceased only when the façades were tied into the new structure. The retaining wall and temporary works support system for the new basement proved extremely stiff and watertight. Lateral wall...
Journal Articles
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2002) 155 (3): 163–173.
Published: 01 July 2002
... stresses retaining walls roads & highways temporary works Further details concerning ground conditions and geotechnical properties are given by Gourvenec. 1 The mesh discretised a block of ground of dimensions 100 m wide (x-direction) by 50 m deep (y-direction) by 20 m...
Journal Articles
M. Batten, BEng, PhD, W. Powrie, MA, MSc, PhD, CEng, FICE, R. Boorman, BSc, MEng, CEng, FICE, FIStructE, H.-T. Yu, MSc, PhD, CEng, FIMM, Q. Leiper, MSc, CEng, FICE, FIHT, CGeol, FGS
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (1999) 137 (1): 3–13.
Published: 01 January 1999
... 1999 field testing & monitoring retaining walls temporary works Use of vibrating wire strain gauges to Proc. Instn measure loads in tubular steel props Civ. Engrs Geotech. Engng, 1999, 137, Jan., supporting deep retaining walls 3±13 Paper 11380 M. Batten, BEng, PhD, W. Powrie, MA, MSc...
