ABSTRACT: Two tall geosynthetic-reinforced soil (GRS) walls, one 16.7 m high supporting a sloped embankment, and the other 21.1 m high with a level backfill, were constructed to support the taxi way of Mt. Fuji Shizuoka Airport, Shizuoka Prefecture, Japan, which was opened to service in June 2009. As only limited residual deformation during service is allowed and high stability is required, the backfill was a well-graded gravelly soil, which was well compacted at controlled water content and reinforced with geogrid reinforcement. In the respective walls, three representative geogrid layers were fitted with a number of electric-resistance strain gauges to monitor the geogrid tensile strains during and after construction to ensure high stability and sufficient serviceability. After the wall construction had been completed, the geogrid strains were either only increasing at a very low rate, or had stopped increasing, or had started decreasing. A series of in-air tensile loading tests were performed on different geogrid types used for the wall construction to evaluate their elasto-viscoplastic properties. The time histories of tensile force in the geogrid layers were estimated from the measured time histories of the geogrid strains based on a non-linear three-component rheology model using the model parameters determined by the in-air tensile loading tests. After the end of wall construction, the estimated geogrid tensile force was either increasing at a very low rate or was decreasing with time. Even at the locations where it tended to increase with time, the estimated geogrid tensile force never increased greatly by the end of a typical design life (i.e. 50 years) from the value at the end of wall construction. As the estimated maximum geogrid force at the end of the design lifetime is substantially lower than the respective design tensile rupture strengths, it is estimated that creep rupture failure of the geogrid is utterly unlikely. The analysis suggests that these estimates are also relevant when the lifetime is 100 years. The framework to estimate the time histories of reinforcement force from the time histories of measured reinforcement strains used in this study can be applied to other similar cases.
Article navigation
1 February 2010
Research Article|
February 01 2010
Time histories of tensile force in geogrid arranged in two full-scale high walls
W. Kongkitkul;
W. Kongkitkul
1
Lecturer, Department of Civil Engineering, King Mongkut's University of Technology Thonburi, 126 Pracha u-tid Road, Bangmod, Toongkru, Bangkok, 10140, Thailand, Telephone: +66 2 470 9144, Telefax: +66 2 427 9063, E-mail: warat.kon@kmutt.ac.th
Search for other works by this author on:
F. Tatsuoka;
F. Tatsuoka
2
Professor, Department of Civil Engineering, Tokyo University of Science, 2641 Yamazaki, Noda, Chiba, 278–8510, Japan, Telephone: +81 4 7122 9819, Telefax: +81 4 7123 9766, E-mail: tatsuoka@rs.noda.tus.ac.jp
Search for other works by this author on:
D. Hirakawa;
D. Hirakawa
3
Assistant Professor, Department of Civil and Environmental Engineering, National Defense Academy, 1–10–20 Hashirimizu, Yokosuka, 239–8686, Japan, Telephone: +81 4 6841 3810 (ext. 3514), Telefax: +81 4 6844 5913, E-mail: hirakawa@nda.ac.jp
Search for other works by this author on:
T. Sugimoto;
T. Sugimoto
4
Engineer, Shizuoka Prefecture, 9–6 Otemachi, Aoi-ku, Shizuoka, Japan, 420–8601, Telephone: +81 54 221 3043, Telefax: +81 54 221 3564, E-mail: toshihiko1_sugimoto@pref.shizuoka.lg.jp
Search for other works by this author on:
S. Kawahata;
S. Kawahata
5
Consulting engineer, Nippon-koei Co., Ltd., Nagoya Branch, 2–17–14 Higashisakura, Higashi-ku, Nagoya, Aichi, Japan, 461–0005, Telephone: +81 52 559 7301, Telefax: +81 52 939 3472, E-mail: a5054@n-koei.co.jp
Search for other works by this author on:
M. Ito
M. Ito
6
Engineer, Maeda-Kosen Co., Ltd., Nihon-bashi Building 5F, Hisamatsuo-cho, Nihonbashi, Chuo-ku, Tokyo, Japan, 103–0005, Telephone: +81 3 3663 7828, Telefax: +81 3 3663 9930, E-mail: m_ito@mdk.co.jp
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
July 27 2009
Revision Received:
November 17 2009
Accepted:
November 18 2009
Online ISSN: 1751-7613
Print ISSN: 1072-6349
© 2010 Thomas Telford Ltd
2010
Geosynthetics International (2010) 17 (1): 12–32.
Article history
Received:
July 27 2009
Revision Received:
November 17 2009
Accepted:
November 18 2009
Citation
Kongkitkul W, Tatsuoka F, Hirakawa D, Sugimoto T, Kawahata S, Ito M (2010), "Time histories of tensile force in geogrid arranged in two full-scale high walls". Geosynthetics International, Vol. 17 No. 1 pp. 12–32, doi: https://doi.org/10.1680/gein.2010.17.1.12
Download citation file:
New and popular articles
Suggested Reading
Performance of three geogrid-reinforced soil walls before and after foundation failure
Geosynthetics International (August,2015)
Long-Term Variations of Force and Strain in a Steep Geogrid-Reinforced Soil Slope
Geosynthetics International (January,2001)
Creep rupture curve for simultaneous creep deformation and degradation of geosynthetic reinforcement
Geosynthetics International (August,2007)
Viscous deformation of geosynthetic reinforcement under cyclic loading conditions and its model simulation
Geosynthetics International (April,2004)
Geosynthetic MSE walls research and practice: past, present, and future (2023 IGS Bathurst Lecture)
Geosynthetics International (January,2025)
Related Chapters
Unpaved roads
Handbook of Geosynthetic Engineering: Geosynthetics and their applications
NUMERICAL SIMULATION OF CEMENT BASED MATERIALS TIME DEPENDENT BEHAVIOUR
Application of Codes, Design and Regulations: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
Paved roads
Handbook of Geosynthetic Engineering: Geosynthetics and their applications
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.