Skip to Main Content
Article navigation

Although different kinds of foundations have been investigated against an earthquake faulting, the interaction between pile group and dip–slip fault has not yet been fully understood. This paper investigates the interaction between piled raft and normal faulting by means of centrifuge and numerical modelling. In centrifuge test, a piled raft was simulated with a half model for a better observation of fault rupture path under the raft. The loading transfer mechanism was further examined using a three-dimensional finite difference software. The measured and computed results showed that the piled raft displaced and tilted linearly with the magnitude of faulting. The fault rupture bifurcated into two and diverted towards both edges of the raft. Two types of loading transfer mechanism were identified during faulting. Working load transferred from the raft to the underneath piles, and also from the piles on the side of the hanging wall to the piles on the footwall side, resulting in compression failure of the piles on the footwall side.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal