Empingham Dam was built in the early 1970s on a brecciated Upper Lias Clay foundation of fill derived from it. When the dam was designed, the undrained behaviour of intact stiff plastic clay in the field was poorly understood. Thus, a conservative bound to conventional strength tests was adopted to provide an undrained strength profile in the foundation. The shearing resistance of the foundation was also investigated by incorporating an instrumented 24 m high trial bank in the upstream berm of the main dam. As the trial bank was nearing completion, two slips occurred in temporary borrow pit slopes. It was considered that this field experience, together with undrained triaxial tests with pore pressure measurement on large diameter samples carried out in the laboratory, justified the original design assumptions. However, the end lengths of the main embankment on the undrained foundation started to spread laterally when the fill was some 2 m below the final level. This was in spite of the fact that the conventional factor of safety, calculated using the original design assumptions, was in excess of two. This paper describes the finite element (FE) back analysis of the observed behaviour. For this purpose two different constitutive models have been employed: a kinematically hardening ‘bubble’ model accounting for pre-peak plasticity, and a non-linear elastic Mohr-Coulomb plastic model accounting for strain-softening. It is demonstrated that the observed undrained behaviour of the Empingham foundation can be reproduced by FE analyses, but only if the undrained shearing resistance varies from section to section.
Article navigation
March 2007
Research Article|
March 01 2007
Undrained behaviour of brecciated Upper Lias Clay at Empingham Dam
N. Kovacevic;
N. Kovacevic
*
Geotechnical Consulting Group
London
Search for other works by this author on:
K. G. Higgins;
K. G. Higgins
*
Geotechnical Consulting Group
London
Search for other works by this author on:
P. R. Vaughan
P. R. Vaughan
†
Imperial College
London, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
May 05 2006
Accepted:
November 30 2006
Online ISSN: 1751-7656
Print ISSN: 0016-8505
© 2007 Thomas Telford Ltd
2007
Geotechnique (2007) 57 (2): 181–195.
Article history
Received:
May 05 2006
Accepted:
November 30 2006
Citation
Kovacevic N, Higgins KG, Potts DM, Vaughan PR (2007), "Undrained behaviour of brecciated Upper Lias Clay at Empingham Dam". Geotechnique, Vol. 57 No. 2 pp. 181–195, doi: https://doi.org/10.1680/geot.2007.57.2.181
Download citation file:
New and popular articles
Suggested Reading
Finite-element analysis of the failure and reconstruction of the main dam embankment at Abberton Reservoir, Essex, UK
Geotechnique (July,2013)
Numerical assessment of the effects of end-restraints and a pre-existing fissure on the interpretation of triaxial tests on stiff clays
Geotechnique (July,2020)
DEM modelling of mini-triaxial test based on one-to-one mapping of sand particles
Geotechnique (June,2020)
Review and interpretation of primary floor failure mechanism at a longwall coal mining face based on numerical analysis
Geotechnique (October,2000)
Slope stability analysis by finite elements
Geotechnique (June,1999)
Related Chapters
Undrained behaviour of brecciated Upper Lias Clay at Empingham Dam
Selected papers on geotechnical engineering by P R Vaughan
Undrained behaviour of brecciated Upper Lias Clay at Empingham Dam
Stiff Sedimentary Clays: Genesis and Engineering Behaviour: Géotechnique Symposium in Print 2007
Empirical predictive relationship for seismic lateral displacement of slopes: models for stable continental and active crustal regions
Geotechnical Earthquake Engineering: Géotechnique Symposium in Print 2015
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.