Skip to Main Content
Article navigation

This Paper describes the observational method developed for the economic study of the treatment of gold mine workings and their relationship to the proposed structures above them. The philosophy behind the contract documentation required by this method is discussed and case histories illustrate its successful use.

L'article décrit la méthode d'observation qui a été mise en oeuvre lors de l'analyse économique des travaux d'exploitation d'une mine d'or et de leurs relations avec les structures de surface proposées. La philosophie du contract nécessaire à cette méthode est analysée et illustrée par quelques cas.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal