This paper reports the results of monitoring carried out to study the patterns of ground displacement that develop ahead of an advancing sprayed concrete lined tunnel in soft ground. Extensive instrumentation was installed and monitored during the construction of the Heathrow Express platform tunnels forming part of the underground station at London Heathrow's Terminal 4. The construction of the concourse tunnel, built between the two completed platform tunnels, provided the opportunity to install additional instrumentation ahead of the tunnel drive, and to measure ground movements as the tunnel approached the instrumented sections. The paper describes the ground conditions at Heathrow, and the method of construction used for the concourse tunnel. The performance of the instrumentation and the pattern of ground displacements measured are reported. Finally, a synthesis of ground displacements measured is given, and the results are compared with the volume loss recorded during the concourse tunnel construction.
Article navigation
November 2003
Research Article|
November 01 2003
Displacements ahead of an advancing NATM tunnel in the London clay Available to Purchase
J. P. Van Der Berg;
J. P. Van Der Berg
*
Jones and Wagener
South Africa
Search for other works by this author on:
C. R. I. Clayton;
C. R. I. Clayton
†
School of Civil Engineering and the Environment, University of Southampton
UK
Search for other works by this author on:
D. B. Powell
D. B. Powell
‡
Mott MacDonald
UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
April 18 2002
Accepted:
September 03 2003
Online ISSN: 1751-7656
Print ISSN: 0016-8505
© 2003 Thomas Telford Ltd
2003
Geotechnique (2003) 53 (9): 767–784.
Article history
Received:
April 18 2002
Accepted:
September 03 2003
Citation
Van Der Berg JP, Clayton CRI, Powell DB (2003), "Displacements ahead of an advancing NATM tunnel in the London clay". Geotechnique, Vol. 53 No. 9 pp. 767–784, doi: https://doi.org/10.1680/geot.2003.53.9.767
Download citation file:
Suggested Reading
Greenfield ground response to EPBM tunnelling in London Clay
Geotechnique (April,2013)
Predicting tunnelling-induced ground movements and interpreting field measurements using numerical analysis: Crossrail case study at Hyde Park
Geotechnique (May,2017)
Measured short-term subsurface ground displacements from EPBM tunnelling in London Clay
Geotechnique (July,2017)
Numerical investigation of the effects of tunnelling on existing tunnels
Geotechnique (July,2017)
Measured short-term ground surface response to EPBM tunnelling in London Clay
Geotechnique (November,2016)
Related Chapters
Measured short-term subsurface ground displacements from EPBM tunnelling in London Clay
Tunnelling in the Urban Environment: Géotechnique Symposium in Print 2017
Numerical investigation of the effects of tunnelling on existing tunnels
Tunnelling in the Urban Environment: Géotechnique Symposium in Print 2017
Soil improvement by the vacuum preloading method for an oil storage station
Ground and Soil Improvement
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
