Very limited information is available regarding the impact of heating and cooling processes on the geotechnical performance of piled foundations incorporating pipe loops for ground-source heat-pump systems (so-called energy piles). A pile-loading test that incorporated temperature cycles while under an extended period of maintained loading was undertaken to investigate the behaviour of an energy pile installed in London Clay. Testing was carried out over a period of about seven weeks, with conventional loading tests carried out either side of an extended loading test with thermal cycles. Using an optical fibre sensor system, and other more conventional instrumentation, temperature and strain profiles were observed in the test pile, an adjacent bore-hole, two of the anchor piles, and the heat sink pile. Details of load and movement at the pile head, of ambient air temperature and of the input/output temperature of fluid within the heating system were also recorded. Thermodynamic behaviour observed during the test supports the assumption that the pile acts as an infinitely long heat sink/source, and that the conductivity values used for the London Clay were reasonable. Forces mobilised in the pile shaft and the resistance mobilised at the pile/soil interface have been inferred from the test response, and the effects have been described using a simplified mechanism. Concrete stresses additional to those due to static loading are generated when the pile is heated, and the pile end-restraint conditions influence the effect; concrete stresses could potentially exceed the limiting values imposed by design codes. In this case there was a large margin between the pile ultimate shaft resistance and the shear stresses mobilised at the pile/soil interface during thermal cycling, and as a consequence, it is considered unlikely that the geotechnical capacity of the pile was affected significantly.
Article navigation
April 2009
Research Article|
April 01 2009
Energy pile test at Lambeth College, London: geotechnical and thermodynamic aspects of pile response to heat cycles Available to Purchase
P. J. Bourne-Webb;
P. J. Bourne-Webb
*
Cementation Skanska Ltd
Rickmansworth, UK
Search for other works by this author on:
B. Amatya;
B. Amatya
†
Department of Engineering, University of Cambridge
UK
Search for other works by this author on:
K. Soga;
K. Soga
†
Department of Engineering, University of Cambridge
UK
Search for other works by this author on:
T. Amis;
T. Amis
‡
Geothermal International Ltd
Coventry, UK
Search for other works by this author on:
C. Davidson;
C. Davidson
‡
Geothermal International Ltd
Coventry, UK
Search for other works by this author on:
P. Payne
P. Payne
*
Cementation Skanska Ltd
Rickmansworth, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
May 06 2008
Accepted:
December 02 2008
Online ISSN: 1751-7656
Print ISSN: 0016-8505
© 2009 Thomas Telford Ltd
2009
Geotechnique (2009) 59 (3): 237–248.
Article history
Received:
May 06 2008
Accepted:
December 02 2008
Citation
Bourne-Webb PJ, Amatya B, Soga K, Amis T, Davidson C, Payne P (2009), "Energy pile test at Lambeth College, London: geotechnical and thermodynamic aspects of pile response to heat cycles". Geotechnique, Vol. 59 No. 3 pp. 237–248, doi: https://doi.org/10.1680/geot.2009.59.3.237
Download citation file:
Suggested Reading
Transient thermal response of a thermally activated pile during a long-term maintained load test at Lambeth College, London
Geotechnique (March,2021)
Thermo-mechanical behaviour of energy piles
Geotechnique (June,2012)
Compression load tests on large open-ended pipe piles in dense North sea sand
Geotechnique (December,2025)
Desiccation cracking at field scale on a vegetated infrastructure embankment
Geotechnique Letters (February,2021)
A simple approach for predicting the ultimate lateral capacity of a rigid pile in sand
Geotechnique Letters (July,2020)
Related Chapters
An instrumented trial of vibro ground treatment supporting strip foundations in a variable fill
Ground and Soil Improvement
Installation effects of a bored pile wall in overconsolidated clay
Stiff Sedimentary Clays: Genesis and Engineering Behaviour: Géotechnique Symposium in Print 2007
Pore water pressure and horizontal stress changes measured during construction of a contiguous bored pile multi-propped retaining wall in Lower Cretaceous clays
Stiff Sedimentary Clays: Genesis and Engineering Behaviour: Géotechnique Symposium in Print 2007
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.