Skip to Main Content
Article navigation

A high-speed railway project for trains of speeds of up to 160 km/h is currently being constructed between Rawang and Bidor (110 km long) in Peninsular Malaysia. The ground improvement methods adopted in the project are vibro-replacement with stone columns, dry deep soil mixing (cement columns), geogrid-reinforced piled embankments with individual pile caps and removal/replacement works. This paper provides a detailed insight into the design and implementation of vibro-replacement and the deep soil mixing treatment methods used in the project. The use of plate bearing tests and field instrumentation to monitor the performance of the stone columns and soil mixing ground treatment methods is also discussed. This paper also provides a brief overview of other treatment methods implemented in this high-speed railway project such as a pile embankment with geogrids and removal/replacement works.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Please sign in to your personal account to gift article access.

Register

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses.

You have reached the limit of 10 links within a 30 day period.