Haneda/Tokyo International Airport was established in 1931 as the first primary airport in Japan where a runway of 300 m was operated. The airport has been expanded several times and the current airport has three runways and two terminal buildings on the man-made island. In order to cope with the future increase in air transportation, the fourth runway was constructed on a man-made island to the south of the existing airfield in 2010. As soft soil strata were stratified at the construction site, several ground improvement techniques were employed to improve the ground. As the project site was adjacent to the current airport, a large part of the construction site was regulated as a restricted area under the Civil Aeronautics Act of Japan. Under the limitation, the construction project had to be progressed under a very tight schedule. In this paper, the application of the ground improvement techniques is briefly introduced as well as an outline of the construction project.
Article navigation
May 2012
Research Article|
May 01 2012
Ground improvements in Haneda/Tokyo International Airport expansion project Available to Purchase
Masaki Kitazume, DrEng
Masaki Kitazume, DrEng
Professor
Tokyo Institute of Technology, Tokyo, Japan
Search for other works by this author on:
Publisher: Emerald Publishing
Revision Received:
October 29 2011
Accepted:
January 03 2012
Online ISSN: 1755-0769
Print ISSN: 1755-0750
ICE Publishing: All rights reserved
2012
Proceedings of the Institution of Civil Engineers - Ground Improvement (2012) 165 (2): 77–86.
Article history
Revision Received:
October 29 2011
Accepted:
January 03 2012
Citation
Kitazume M (2012), "Ground improvements in Haneda/Tokyo International Airport expansion project". Proceedings of the Institution of Civil Engineers - Ground Improvement, Vol. 165 No. 2 pp. 77–86, doi: https://doi.org/10.1680/grim.10.00031
Download citation file:
Suggested Reading
Pilot tests on methods to form working platform on soft clay
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (April,2017)
Carbon dioxide accounting: 2014 Commonwealth Games Athletes' Village
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (March,2013)
Reclamation of a slurry pond in Singapore
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (February,2009)
Soil improvement works for an offshore land reclamation
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (February,2009)
Experiments on the influence of laser light on some biological elements of the natural environment
Environmental Management and Health (October,1997)
Related Chapters
Introduction
Inside London's Airports Policy: Indecision, decision and counter-decision
A brief overview of air-transport history
Inside London's Airports Policy: Indecision, decision and counter-decision
Airports policy up to the 1974 Maplin Review
Inside London's Airports Policy: Indecision, decision and counter-decision
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.